Regulators will need to evaluate how well operators would cope if they lost both primary power and backup diesel generators for an extended period.
监管者需评估反应堆在长时间失去主要动力及备用柴油发电机失效的情况下应对的能力。
7 hr 30 min Even after operators pump water into the primary loop, pressure is still high. The PORV 'backup valve is opened to lower the pressure.
7小时30分钟尽管操作员已将水抽入主回路,但温度仍然很高。减压阀的备用阀门被打开,减少压力。
7 hr 30 min Even after operators pump water into the primary loop, pressure is still high. The PORV 'backup valve is opened to lower the pressure.
7小时30分钟尽管操作员已将水抽入主回路,但温度仍然很高。减压阀的备用阀门被打开,减少压力。
应用推荐