I have seen graphs showing that, optimally, a single resource should be assigned to two projects.
我曾经见到有图这样显示,最佳的是,将单个资源分配到两个项目中。
This will ensure that the assigned predicate points to a resource (and not a literal).
这样可以保证分配的谓词指向资源(而不是文字)。
Once the resource is assigned to a project, they now have two managers: the project manager for the IT project and the resource owner for analysts.
一旦将资源分配到项目中,他们就有了两个经理:IT 项目的项目经理和分析人员的资源所有者。
The application server runtime USES these bindings to determine if a specific user has a role assigned, and then decides whether or not the protected resource can be accessed.
应用服务器运行时使用这些绑定来确定是否向特定的用户授予了某个角色,然后决定是否可访问受保护的资源。
By default, an LDAP property will be assigned to a predicate that has a literal resource.
ldap属性默认分配文字资源谓词。
Resources that are stored on the WSRR Server are uniquely identified by a namespace and a name, both of which are assigned when the resource is added to the registry.
存储在WSRRServer上的资源通过命名空间和名称唯一地进行标识,命名空间和名称都是在将资源添加到注册中心时分配的。
Owner maps to the resource that has been assigned through the evaluation process (this is entirely dependent on your change control processes) as the owner of the record.
Owner映射到资源中,这些资源是通过像记录所有者一样对进行评估的过程而分配的(这完全取决于您的变更控制过程)。
If the Owner field is blank, the user doing the import will become the task Responsible in Rational Portfolio Manager (until such time as a new resource is assigned task responsibility).
如果这个Owner字段是空白的,那么这个用户操作的这个导入将会变为RationalPortfolioManager(直到这个时间作为一个新资源分配到任务职责中)中的Taskresponsible。
The effort and resource assigned to data governance should be commensurate with the risk to product quality, and should also be balanced with other quality assurance resource demands.
投入到数据管理的精力和资源应与对应产品质量风险相称,同时也应权衡其他质量保证工作的资源需求,从而进行合理分配。
If the optional var attribute is specified, then the resource bundle identified by the basename attribute will be assigned to the variable named by this attribute's value.
如果指定了可选的var属性,那么将把由basename属性所标识的资源束赋给该属性值所命名的变量。
There is definite reference that computer resource between the corporation and the department is rationally assigned.
对企业内部或系统内各部门之间计算机资源的合理分配及组网形式有一定参考作用。
This task has insufficiently intersecting task and resource calendars. The task's calendar or the calendar of the resources assigned to it should be changed.
此任务的日历和资源日历没有足够的重叠时间。请更改任务日历或分配给该任务的资源的日历。
Your resource file contains resources to which these calculated symbols are already assigned.
您的资源档包含了这些计算符号已经指派到的资源。
Upstream bandwidth resource is assigned according to different T-CONT priority in the algorithm.
该算法按照不同t -CONT业务的优先级顺序分配上行带宽资源。
Table 1 Resource gradients division of soil factors. The same values in adjacent grades are assigned to the lower grade.
表1土壤因子梯度等级划分。相邻等级中相同的值划入低等级。
While in the Resource Symbols dialog box, you can edit or delete existing symbols that are not already assigned to a resource or object.
在“名称”框中选择未分配的符号,然后单击“更改”。在“更改符号”对话框中提供的框中编辑符号的名称或值。
To change a symbol that is assigned to a resource or object, you must use the resource editor or Properties window.
若要变更已指定给资源或物件的符号,您必须使用资源编辑器或[属性]视窗。
You can use the resource symbols dialog box to change the names of symbols not currently assigned to a resource.
您可以使用资源符号对话方块变更目前未指定给资源的符号名称。
You can use the resource symbols dialog box to change the value of symbols not currently assigned to a resource.
您可以使用资源符号对话方块变更目前未指定给资源的符号值。
The effort and resource assigned to data governance should be commensurate with the risk to product quality, and should also be balanced with other quality assurance resource demands.
给数据管理提供的努力和资源应与产品质量的风险相称,还应与其它质量保证资源需求相平衡。
The effort and resource assigned to data governance should be commensurate with the risk to product quality, and should also be balanced with other quality assurance resource demands.
给数据管理提供的努力和资源应与产品质量的风险相称,还应与其它质量保证资源需求相平衡。
应用推荐