The manager may assign resources freely.
主管可以凭自由意志分配资源。
Does the resource manager assign resources?
资源经理负责资源的委派?
Does a project manager select a team and then assign resources to tasks?
还是项目经理选择团队然后为任务指定资源?
The business analyst can assign resources and durations to each of the tasks in the process.
业务分析师能够将资源和时间分配给过程中的每一项任务。
DB2 WLM (workload management) solution to assign resources to high-priority applications.
DB 2WLM(工作负载管理)解决方案,可以把资源分配给高优先级的应用程序。
The flexible resources assignment models are convenient for equipment support command and control system to assign resources and can meet the requirements of complex equipment support tasks.
装备保障资源的柔性分配模型有利于装备保障指挥系统进行资源调度,可以满足复杂的装备保障任务对资源的需求。
Process engine doesn't execute model sternly any more. And WSPE can modify the executing process instance, change the related humans and assign resources dynamically by managing process module.
过程引擎不再机械地执行模型规定的流程,通过过程管理模块,WSPE能实现流程的变更、人员的变动和资源的动态分配。
For example, if your group is working on a project, add activities to help members assign tasks, track progress, and share resources.
例如,如果您的群组正在从事一个项目,那么可以添加一些活动以帮助成员分配任务、跟踪进度并共享资源。
Analyze the components of your architecture to assign characteristics that drive the choice of resources and methodology.
分析体系结构的组件,以分配驱动资源和方法选择的特征。
By utilizing elastic server resources in the cloud "as needed" workloads needed to building projects can be better assign, resulting in reduced build times.
通过“按需”使用云中弹性的服务器资源,它能够更好地分配构建项目所需的工作负载,从而降低构建时间。
This is useful in cases when a user wants to assign exclusive computing resources for CPU-intensive applications.
这对于希望为 CPU 密集型应用程序分配专用计算资源的情况很有用。
This allows the administrator to dynamically assign the resources to the partition where they are needed, when they are needed.
这样管理员就可以在需要时将资源动态分配到需要的地方。
The team takes a closer look at the project plan and identifies opportunities to consolidate activities or assign additional activities to fewer resources.
团队会更仔细地审视项目计划,确定是否有可能合并活动,或让更少的资源承担更多的活动。
In particular, Visual Studio adds code to load the correct localized resources and assign their values to form and control properties.
特别是,VisualStudio需要添加代码来加载正确的本地化资源,并将它们的值分配给窗体和控件属性。
The project managers could also assign individual hardware resources to different cloud types: Web development cloud, testing cloud, and production cloud.
项目管理人员可以为不同的云类型分配不同的硬件资源:Web开发云、测试云和产品云。
You can assign the destination of the message-driven rule bean using the application server resources.
您可以使用应用程序服务器资源来分配消息驱动规则bean的目的地。
For a project to take interaction design and usability seriously, it must assign them "story points" (i.e., resources) on an equal footing with the coding.
对一个专案而言,要认真看待互动设计与使用性工程的话,需要跟开发程式一样,指派他们一些「故事点数(story points) 」(即,资源)。
Essentially, the first step is to create the resource model and assign specific resources to fulfill the roles and form the proposal team. Some of the roles that are absolutely necessary are.
事实上,第一个步骤是建立模型并分配特定的资源,以实现多种角色,组建提案团队。
Most of the time, you won't care exactly how the configuration has changed and can simply re-assign all your resources that provide alternatives to the configuration that you're handling.
在很多时候,你不会确切地在乎这些配置是怎么改变的,并且可以简单地重新分配所有资源,提供您正在处理的配置的可替代资源。
Since I started working with project natures (see Resources for links to the previous articles), I have been searching for an option to assign the XM nature to any project.
自从我开始使用项目性质(nature)(请参阅参考资料以获取以前文章的链接)以来,我一直在搜索一种选项来将XM性质分配给任何项目。
Assign your new style to a user in the userDirectory.properties file within the resources folder of the command bean project, as shown in Figure 3.
将您的新样式分配给commandbean项目resources文件夹下userdirectory .propertie文件中的一个用户,如图3所示。
Evaluate manpower needs and assign available resources.
评估人力需求并合理分配现有资源。
Resource access control policies. Provide the ability to grant access to resources by users or groups and assign attributes to protect those resources.
资源的访问控制政策提供授予对资源的用户或组的访问权限,并将属性来保护这些资源分配的功能。
It is an important content to use and assign human resources rationally in complex system analysis and design.
人力资源的合理分配和使用是复杂系统分析和设计过程中的一项重要内容。
Scheduling is to assign some tasks to time resources under some constraints, such that one- or multi-criteria attain to the optimum.
所谓排序,就是在一定的约束条件下分配时间资源去完成一些任务,使一个或多个目标达到最优。
Departments of commercial administration above county-level shall set up authorities in chare of the administration of renewable resources recovery industry and assign the relevant personnel.
县级以上商务主管部门应当设置负责管理再生资源回收行业的机构,并配备相应人员。
The limited equipment support resources require that the equipment support command and control system should assign the resources flexibly.
通过对装备保障资源概念模型进行分析,具体描述了资源柔性分配过程。
Assign one staff to record any staff or students who develop influenza-like symptoms or absence from work. Inform Administration and Human Resources Office.
安排一位同事记录患病或缺勤的同事或同学人数,并通知行政及人力资源处。
Assign one staff to record any staff or students who develop influenza-like symptoms or absence from work. Inform Administration and Human Resources Office.
安排一位同事记录患病或缺勤的同事或同学人数,并通知行政及人力资源处。
应用推荐