You have been assigned as the project manager on a project with a clearly defined scope limited to the design-and-build phase of a product assembly line.
您已经被委派为某项目的项目经理,职权范围明确界定,限于产品总装的设计及建设阶段。
You have been assigned as the project manager on a project with a clearly defined scope limited to the design-and-build phase of a product assembly line.
您已经被委派为某项目的项目经理,职权范围明确界定,限于产品总装的设计及建设阶段。
应用推荐