• This article obtains from the runoff energy, in the room in the artificial rain experiment foundation, analyzed the slope tillage measure to the runoff energy reduction function.

    径流能量入手室内人工降雨试验基础上分析坡面耕作措施径流能量的削减作用。

    youdao

  • Artificial damage change stability of natural slope, and lead to formation of tensile fissure.

    人为破坏改变自然斜坡稳定状态产生了初始的裂缝

    youdao

  • The impacts of slope length on sediment yield under different conditions are experimentally studied by means of artificial rainfall simulation.

    研究通过一系列人工模拟降雨,研究了不同条件下坡侵蚀产沙过程影响

    youdao

  • In comparison with barren slope, a pilot study of hydrology effect of artificial woodland surface soil in semi-arid low mountainous upland region of western Liaoning province was carried out.

    荒山为对照对辽西干旱低山丘陵区人工林地表层土壤水文效应进行初步研究

    youdao

  • The stability evaluation of artificial high slope is a half-structure problem.

    稳定性评价典型结构化问题

    youdao

  • This article obtains from the runoff energy, in the room in the artificial rain experiment foundation, analyzed the slope tillage measure to the runoff energy reduction function.

    室内人工降雨试验基础上分析坡面耕作措施蓄水保土效益。

    youdao

  • The artificial factor includes highway construction and the cognition degree to slope deformation and destruction.

    人为因素则主要包括公路建设人们边坡变形破坏认识程度两方面。

    youdao

  • An artificial neural network algorithm, based on variable slope BP algorithm and conjugate gradient algorithm, is presented in this paper.

    在常规算法基础提出种基于斜率算法共轭梯度算法的接力逆向传播算法。

    youdao

  • The high cut slope is the artificial steep slope transformed from natural pitch through human project activity.

    人类工程活动对自然斜坡的改造而形成的人工陡坡

    youdao

  • The electrolyte pulse method is used to measure the velocity of sheet flow on a slope in laboratory under the condition of artificial raining.

    通过室内不同坡度和降雨强度下用电解质脉冲对坡面水流速度进行测量

    youdao

  • Granular soils, because of its good engineering characteristics, are applied extensively in the railroad foundation, the side slope, the artificial island etc.

    粗粒优良工程特性铁路路基边坡护岸、人工筑工程中应用广泛

    youdao

  • Analysis of the two methods for technology and economics has been made. It is considered that the artificial consolidation and comprehensive control for the designed slope are rational and...

    两种方法进行技术经济分析比较,认为设计边坡进行人工加固综合治理无论技术上、经济上和生产方面都是合理可行的方案。

    youdao

  • The feasibility of the protective coal pillar mining in the artificial inclined steep drift in the thick (ultra thick) coal seam of a large slope is discussed.

    论证倾斜(厚)煤层伪斜上山保护煤柱回收可行性。

    youdao

  • The feasibility of the protective coal pillar mining in the artificial inclined steep drift in the thick (ultra thick) coal seam of a large slope is discussed.

    论证倾斜(厚)煤层伪斜上山保护煤柱回收可行性。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定