There are three basic classes of the component: activity class, project class and arrow network tools class.
该组件有三个基本类:工序类、工程类及网络计划工具类。
In this paper, based on object-oriented technique, an applied arrow network model is studied and a component of arrow network tools is developed.
作者结合面向对象的设计思想,提出了一种实用的网络计划模型,并实现了实用网络计划工具类组件。
With the demonstration and comparison of activity-on-arrow network and time-scaled network in this paper, proper conclusion is expected to drawn.
文章通过对双代号网络、单代号网络及时标网络的对照及论证,得出虚工作的时间参数可以不计算的结论。
In view of activity-on-arrow network drawing difficultly, describes the methods of determine the dummy arrow. It will enable the rapid and accurate drawing.
针对双代号网络图绘制困难的问题,介绍了绘图时虚箭线的判定方法,有利于快速、准确地成图。
In the activity-on-arrow network, there are essential differences between positive activity and dummy activity. The main function of dummy activity is to transfer the logical relationship in the work.
在双代号网络图中,虚工作和实工作有着本质的区别,其主要作用是传递工作之间的逻辑关系。
On the Live homepage, click add People. Select the network from which to add your contacts, and click the right arrow.
在Live主页,点击添加联系人,选择要添加联系人的网络,点击向右的箭头。
On the Live homepage, click add People. Select the network from which to add your contacts, and click the right arrow.
在Live主页,点击添加联系人,选择要添加联系人的网络,点击向右的箭头。
应用推荐