That doesn't mean they're useless; simplicity and the test of time have their own advantages.
那并不是说它们没有用处;简单和时间的检验是它们本身的优势。
Your test class now has a protected field called account, and the test method initializes it.
现在您的测试类有一个叫做account的受保护的字段,测试方法对其进行了初始化。
When the semester was over and the test results came out, the classmate scored nearly 100%.
到了期末,该同学在考试中几乎拿了满分。
I added implements Serializable to the class signature of QualifiedName and the test then passed.
我为QualifiedName的类签名添加了implements Serializable,这一次测试顺利通过。
It was nice to have a short break after two back-to-back RACES and the test in Spa.
在两站背靠背的比赛和斯帕测试之后,有段短暂的休息真不错。
When your test scenario has completed, stop the recording, and the test script will be generated.
当您的测试完成时,请停止记录,随后测试脚本将会自动产生。
In Part 2, we showed you how to install and deploy the test application client and the test provider.
在第2部分中,我们向您介绍了如何安装和部署测试应用程序客户端和测试提供程序。
We're adding new platforms all the time and the test suite is getting more and more comprehensive.
我们一直在增加新的平台,而且测试套件也变得越来越全面。
The principle and performance of the receiver system are presented and the test results are given.
文中分析了接收机的原理与性能,给出了试验结果。
The application server ran on one machine, and the test harness and database ran on the second machine.
应用服务器运行在一台计算机上,而测试工具和数据库运行在另一台计算机上。
It was also, he added, "a crucial vehicle to transform Airbus" and the test-bed for a new industrial approach.
他还称,A350 XWB对于“改善空客境况至关重要”,同时也是一种新式工业生产模式的试验台。
The loop and the test are very explicit in Listing 3, whereas in Listing 2 they are done implicitly by the processor.
清单3中的循环和测试非常明显,而在清单2中是由处理程序隐含完成的。
At last, the function and performance of this system are tested, and the test results are analyzed and evaluated.
最后对该系统进行了功能和性能的测试,并对测试结果进行了分析和评价。
And on the tool side, TestNG (for example) USES metadata to communicate between test cases and the test execution tool.
在工具方面,(比如)TestNG使用元数据在测试用例与测试执行工具之间通信。
Based on the Gray System theory and the test data, a strength forecast model of concrete in seawater is established.
根据灰色系统理论,依据试验数据建立了海水作用下混凝土的强度预测模型。
The test results and its analysis show that the hypotheses of the models are correct and the test method is practical.
试验结果和分析表明,该模型的假设和有关理论是正确的,方法是可行的。
The steady state strength concepts, the consolidated-undrained triaxial shear test method and the test results are introduced.
介绍了稳态强度理论的基本概念、稳态强度的固结不排水剪切试验方法及试验结果;
This article used the method of software engineering technology to introduce the image compression code software development and the test.
本文采用软件工程技术的方法详细介绍了图像压缩编码软件的开发及其测试实现过程。
I also force rippling changes whenever I change the behavior of my models, because I must change the model object and the test cases that surround them.
一旦更改模型的行为,就不得不进行连锁更改,因为必须要更改模型对象和围绕这些模型的测试用例。
We need to ensure that the association between this new Web project and the test module is recorded, and that the correct libraries dependencies are created.
我们需要确保记录了此新的Web项目和测试模块之间的关联,并确保创建了正确的库依赖关系。
The structure of middle language is designed, the change from middle language to SQL sentence is researched, the algorithm is given and the test is done.
设计了中间语言的结构,研究了这种中间语言到SQL语句的转换,给出了相应的转换算法,并对算法进行了测试。
WebSphere Application Server enterprise Edition (EE) and the test environment built into Integration Edition provide full run-time support for enterprise services.
WebSphereApplicationServer企业版(Enterprise Edition,EE)和构建到集成版中的测试环境提供了对企业服务完全的运行时支持。
The numbers were then replaced with blank squares and the test subject had to remember which number appeared in which location, then touch the appropriate square.
接下来,数字会被空白的方格所取代,受测者需要回想某个数字出现的位置,然后在屏幕上点出来。
In financial management, financial target is the criterion of the financial policy, the foundation financial behavior and the test standard of financial results.
在财务管理学中,财务目标是财务决策的准绳、财务行为的依据、理财绩效的考核标准。
The team found no further evidence of malaria, and the test that originally detected it has since been withdrawn as it can sometimes cross-react with other substances.
研究团队没有发现疟疾的进一步证据,最初发现疟疾的测试因此作废,因为有时测试会同其它物质发生交叉化学反应。
We have passed the certification to the ISO9001 international quality system, the Germany TUV and SGS tests, and the test of the national sports goods test center.
公司已通过ISO 9001国际质量体系认证,出口产品经德国TUV、SGS以及国家体育用品检测中心检测合格。
In most projects, the software development team usually cannot wait until the requirements team is done, and the test team cannot wait until the software team is done.
在大多数项目中,软件开发团队通常不能等到需求团队完成其工作,而测试团队也不能等到开发团队完成工作。
A design method for low phase noise agile X-band frequency synthesizer is presented, the theoretic analysis and calculation is performed and the test results are given.
介绍一种低相噪、捷变频x波段频率综合器设计方法,并进行理论分析、计算,最后给出测试结果。
This system can complete the engine rotational speed and torque high accuracy control and the test, also engine temperature, pressure, oil consumption parameters survey.
本系统能够完成发动机的转速、转矩的高精度控制与测试,以及发动机温度、压力、油耗等指标参数的测量。
应用推荐