About design scheme, calculate, structure and operation of the advection precipitate pond in BENGANG new sinter shop were presented, and the effect of the precipitate pond was evaluated.
对本钢新烧车间浊环水系统中平流沉淀池的设计、计算依据、平流沉淀池的构造及其生产操作作了详细介绍,并对平流沉淀池的使用效果作了分析。
About design scheme, calculate, structure and operation of the advection precipitate pond in BENGANG new sinter shop were presented, and the effect of the precipitate pond was evaluated.
对本钢新烧车间浊环水系统中平流沉淀池的设计、计算依据、平流沉淀池的构造及其生产操作作了详细介绍,并对平流沉淀池的使用效果作了分析。
应用推荐