That's because the add activity HTML is written after the document has already been loaded (using Ajax), so the Datepicker is not bound to its date input field.
这是因为活动添加HTML是在文档已加载完成(使用Ajax)后编写的,因此Datepicker不会绑定到它的日期输入字段。
The most valuable team members often spend most of their time mentoring other team members, a value-add activity which needs to be reflected in their overall evaluation.
最有价值的团队成员常常花费其大量的时间指导其他的团队成员,这是一个增加价值的活动,需要反映在综合评定中。
The context palette lets you conveniently add the next activity or transition to your workflow.
上下文选项板使您方便地添加下一个活动或者迁移到您的工作流。
Add a message or description to explain why you're adding the bookmark to that group, activity, or blog.
添加一条消息或描述,解释向该组、活动或博客添加书签的原因。
You can add one catch for each fault that could potentially occur within the scope or the activity.
可以为范围或活动中可能发生的每个错误添加一个捕获。
Finally, although you can already add a new activity, you want to remove the unscheduled activities and re-sort the list in ascending order.
最后,尽管您可能已经添加了一项新的活动,但您还需要删除未安排的活动并按照升序重新对列表排序。
First, in this example, you need to add a fault handler on the selected BPEL activity to catch the exceptions it throws.
首先,在本实例中,用户需要在选择的BPEL活动中添加故障处理程序,来捕捉其抛出的异常。
You can only add additional control flow inputs and outputs to an activity after dragging and dropping it into a reusing process model.
当您将某个活动拖放到采用重用方法的流程模型中之后,只能向该活动添加更多的控制流输入和输出。
To correctly capture cyclic processes, add backward connections to the process model that connect to an upstream activity.
要正确捕获循环流程,请在流程模型中添加连接上游活动的逆向连接。
Then add entries to the activity to capture required tasks, store associated documents, and assemble the people that you need to reach the goal.
然后向该活动添加条目,以捕捉所需的任务、存储相关的文档,以及将实现目标所涉及的人员联系起来。
You can add a compensation handler to an invoke or scope activity to take whatever steps are necessary to reverse the completed work.
您可以向调用或范围活动添加补偿处理程序,以执行回退完成的工作所需的步骤。
The editor canvas is actually one big sequence activity where you add more simple or complex activities.
编辑器画布实际上是一个大型结构化活动,您可以在其中添加更多的简单或复杂的活动。
If a developer needs to add a translation with XSLT, this is a new activity that still pops up in the diagram, even in case the business analyst is not interested in that technical detail.
如果开发者需要加入一个使用XSLT的转换,即使业务分析师根本不关心这个技术细节,它也会是一个突然出现在图中的新活动。
They add that reconstruction will create future economic activity that could offset those borrowing costs.
它们还认为,重建能在未来创造经济活动,或能抵消这些借贷成本。
Add a human task between the task ApprovalTask and the snippet activity, as shown in Figure 9.
在任务ApprovalTask和片段活动之间添加一个人工任务,如图9所示。
Create a second case for the Choice activity, by right-clicking Choice, then selecting Add a case, and rename it Reject.
为Choice活动创建第二个case:右键单击choice,然后选择adda case,把它改名为Reject。
And finally, add the code in Listing 11 to limit all User account activity to people who have the admin role.
最后,添加清单11中的代码,将所有user帐户活动限制为只有拥有admin角色的人员才能执行。
In Part 2, you'll design and implement the form, then add it to the activity by using the Forms TAB of the details window.
在第2部分中,您将会设计并实现该表格,然后使用详细窗口的Forms选项卡,将它添加到活动。
Now, add an invoke activity between "Receive" and "Reply" activities to call the CICS service from the process.
现在,在“Receive”和“Reply”活动之间添加一个调用活动来从流程中调用CICS服务。
Under the ShippingFault element in the fault handler, add a snippet activity, and then fill in the details as in Figure 27.
在错误处理程序的ShippingFault元素下,添加snippet活动,然后如图27所示填写详细信息。
To this, add a sequence activity that will be the outermost structural element required in the Echo process.
为此,请添加一个sequence活动,它将成为回送流程所要求的最外层的结构元素。
Now you'll add the room-availability condition to the transition from the gate to the BookRoom activity.
现在您在gate和BookRoom活动之间的迁移上添加一个房间可入住的条件。
First, you need to add an assign activity to your process control flow before the invoke activity (see Figure 10).
首先,在调用活动之前,您需要将分派活动添加到流程控制流(请参见图10)。
As shown in the Figure 10 showing the business process editor with the macro flow that contain Receive and Reply activity, we add the human task by dragging it from palette.
图10展示了具有宏流(macro flow)的业务流程,该宏流包含了Receive和Reply活动,我们可以从面板中拖拽humanTask来添加它。
Addition actions: These actions add a node to an existing one in the process tree; for example, you can add a scope activity to a process, or a while activity to a flow.
添加操作:这些操作向流程树中已经存在的一个节点添加一个节点;例如,您可以向一个process添加一个scope活动,或者向一个flow添加一个while活动。
Now you can add to the sequence a receive activity that can take the customer's message and put it in the appropriate container.
现在,您可以将一个receive活动添加到sequence中,这个 receive活动可以接收客户的消息并把它保存到适当的容器中。
Returning to the process map, Wilby can add a performer to an activity to show which team is responsible for which activity.
返回到流程图,Wilby可以向活动添加执行者,以展示哪个团队负责哪个活动。
In the process, you need to add an invoke activity to send the JMS message. From the BPEL editor, perform the following steps.
在流程中,您需要添加一个调用活动来发送JMS消息。
The activity will then place the message in the specified container and end. You start the sequence activity, and add the receive to it.
随后,活动将把消息放在指定的容器中,然后结束。
In this activity, you add documentation to every element in the model, including every column, every table, every constraint, and every trigger.
在这种情况中,你把文档添加到模型的每一个元素中,包括每个列,每个表,每个约束和每个触发器。
应用推荐