• That's because the add activity HTML is written after the document has already been loaded (using Ajax), so the Datepicker is not bound to its date input field.

    是因为活动添加HTML文档加载完成(使用Ajax)后编写的,因此Datepicker不会绑定日期输入字段。

    youdao

  • The most valuable team members often spend most of their time mentoring other team members, a value-add activity which needs to be reflected in their overall evaluation.

    最有价值团队成员常常花费大量的时间指导其他的团队成员,一个增加价值活动需要反映综合评定中。

    youdao

  • The context palette lets you conveniently add the next activity or transition to your workflow.

    上下文选项板使方便地添加一个活动或者迁移的工作流。

    youdao

  • Add a message or description to explain why you're adding the bookmark to that group, activity, or blog.

    添加条消息描述,解释该组活动或博客添加书签原因

    youdao

  • You can add one catch for each fault that could potentially occur within the scope or the activity.

    可以范围活动可能发生每个错误添加一个捕获

    youdao

  • Finally, although you can already add a new activity, you want to remove the unscheduled activities and re-sort the list in ascending order.

    最后尽管可能已经添加一项新的活动,但您还需要删除安排活动按照升序重新对列表排序。

    youdao

  • First, in this example, you need to add a fault handler on the selected BPEL activity to catch the exceptions it throws.

    首先实例中,用户需要选择BPEL活动中添加故障处理程序捕捉抛出异常

    youdao

  • You can only add additional control flow inputs and outputs to an activity after dragging and dropping it into a reusing process model.

    将某个活动放到采用重用方法的流程模型中之后只能向该活动添加更多的控制输入输出

    youdao

  • To correctly capture cyclic processes, add backward connections to the process model that connect to an upstream activity.

    正确捕获循环流程,请流程模型添加连接上游活动逆向连接

    youdao

  • Then add entries to the activity to capture required tasks, store associated documents, and assemble the people that you need to reach the goal.

    然后活动添加条目捕捉所需任务存储相关文档以及实现目标涉及人员联系起来。

    youdao

  • You can add a compensation handler to an invoke or scope activity to take whatever steps are necessary to reverse the completed work.

    可以调用范围活动添加补偿处理程序执行退完成的工作所需的步骤。

    youdao

  • The editor canvas is actually one big sequence activity where you add more simple or complex activities.

    编辑器画布实际上一个大型结构化活动可以在其中添加更多的简单复杂活动

    youdao

  • If a developer needs to add a translation with XSLT, this is a new activity that still pops up in the diagram, even in case the business analyst is not interested in that technical detail.

    如果开发者需要加入使用XSLT转换即使业务分析师根本关心这个技术细节,它一个突然出现中的活动

    youdao

  • They add that reconstruction will create future economic activity that could offset those borrowing costs.

    它们认为,重建未来创造经济活动,或抵消这些借贷成本

    youdao

  • Add a human task between the task ApprovalTask and the snippet activity, as shown in Figure 9.

    任务ApprovalTask片段活动之间添加一个人工任务,如图9所示。

    youdao

  • Create a second case for the Choice activity, by right-clicking Choice, then selecting Add a case, and rename it Reject.

    Choice活动创建第二case右键单击choice,然后选择adda case,它改名为Reject。

    youdao

  • And finally, add the code in Listing 11 to limit all User account activity to people who have the admin role.

    最后添加清单11中的代码,将所有user帐户活动限制只有拥有admin角色的人员才能执行。

    youdao

  • In Part 2, you'll design and implement the form, then add it to the activity by using the Forms TAB of the details window.

    第2部分中,将会设计实现表格然后使用详细窗口Forms选项卡,将添加活动

    youdao

  • Now, add an invoke activity between "Receive" and "Reply" activities to call the CICS service from the process.

    现在,在“ReceiveReply活动之间添加一个调用活动流程调用CICS服务

    youdao

  • Under the ShippingFault element in the fault handler, add a snippet activity, and then fill in the details as in Figure 27.

    错误处理程序ShippingFault元素添加snippet活动然后如图27所示填写详细信息

    youdao

  • To this, add a sequence activity that will be the outermost structural element required in the Echo process.

    为此请添加一个sequence活动成为回送流程所要求外层结构元素

    youdao

  • Now you'll add the room-availability condition to the transition from the gate to the BookRoom activity.

    现在在gateBookRoom活动之间迁移上添加一个房间可入住的条件

    youdao

  • First, you need to add an assign activity to your process control flow before the invoke activity (see Figure 10).

    首先,在调用活动之前需要将分派活动添加流程控制(请参见10)。

    youdao

  • As shown in the Figure 10 showing the business process editor with the macro flow that contain Receive and Reply activity, we add the human task by dragging it from palette.

    10展示具有(macro flow)业务流程,该宏流包含ReceiveReply活动我们可以从面板中拖humanTask添加它。

    youdao

  • Addition actions: These actions add a node to an existing one in the process tree; for example, you can add a scope activity to a process, or a while activity to a flow.

    添加操作这些操作流程已经存在节点添加个节点;例如可以一个process添加一个scope活动或者向一个flow添加一个while活动。

    youdao

  • Now you can add to the sequence a receive activity that can take the customer's message and put it in the appropriate container.

    现在可以一个receive活动添加sequence中,这个 receive活动可以接收客户消息保存适当容器

    youdao

  • Returning to the process map, Wilby can add a performer to an activity to show which team is responsible for which activity.

    返回流程图Wilby可以活动添加执行者展示哪个团队负责哪个活动。

    youdao

  • In the process, you need to add an invoke activity to send the JMS message. From the BPEL editor, perform the following steps.

    流程中,需要添加一个调用活动发送JMS消息

    youdao

  • The activity will then place the message in the specified container and end. You start the sequence activity, and add the receive to it.

    随后活动消息放在指定的容器中,然后结束

    youdao

  • In this activity, you add documentation to every element in the model, including every column, every table, every constraint, and every trigger.

    这种情况中,文档添加模型一个元素包括每个,每个,每个约束每个触发器

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定