The latter is activity cost, and it can be summed up by the activity cost pool of perception, launching, design, actualizing and consolidating.
后者为变革作业成本,具体通过认知成本、发动成本、设计成本、实施成本、完善成本五个作业成本池进行归集。
The latter is activity cost, and it can be summed up by the activity cost pool of perception, launching, design, actualizing and consolidating.
后者为变革作业成本,具体通过认知成本、发动成本、设计成本、实施成本、完善成本五个作业成本池进行归集。
应用推荐