Mark suggested that a way to save the current project would be by writing a load of acceptance tests and executing them before making a release to the customer.
Mark提出:写大量验收测试,并在软件发布给客户之前运行这些测试,是拯救当前项目的一种方式。
If there is deviation with acceptance criteria, mark and list the DCA code.
如果存在与接受标准的偏离,标记并列出说明偏离的DCA代码。
At last, Shibei High-tech Park passed the site acceptance with the high mark for 936 points.
最终,市北高新园区以936的高分通过现场验收。
At last, Shibei High-tech Park passed the site acceptance with the high mark for 936 points.
最终,市北高新园区以936的高分通过现场验收。
应用推荐