• The workers were on a construction project to dig a railway tunnel, the news agency said.

    通讯社说,工人这个建筑项目中一个铁路隧道

    youdao

  • Once a construction project starts upstream, it requires water compensation downstream.

    一旦上游开始基建项目,下游需要对用水进行补偿

    youdao

  • Unit price method is the fundamental one for calculating the output value of a construction project.

    单价计算建筑工程产值基本方法。

    youdao

  • The project manager is a very important post to ensure quality, safety, time of a construction project.

    项目经理岗位保证工程建设项目质量安全工期重要岗位。

    youdao

  • On a construction project, for example, the estimating process begins with the decision to submit a bid .

    建设项目举例来说,估计过程中开始决定提交出价

    youdao

  • The necessities of controlling construction cost in the early stage of a construction project are analyzed.

    分析工程建设前期造价控制必要性,提出了建设前期控制工程造价的有效途径和措施。

    youdao

  • When you undertake a construction project on your home, it's important to ask the contractor "Are you licensed?"

    从事构建项目时,非常必要询问承包人是否具有许可证? ”?

    youdao

  • The research is expected to present a valid risk-management method on the time limit for a construction project.

    论文研究期望建筑工程项目工期风险管理提供一种有效方法

    youdao

  • More specifically, a construction project may be characterized in relation to the earthmoving operation as follows.

    具体地说一个反面构造项目特征关系土方操作如下

    youdao

  • These persons might be engaged (for example) with a construction project or with developing a new computer application.

    例如这些可能从事建筑项目开发一种新的计算机应用程序

    youdao

  • Estimation of the investment of a construction project is an important task in the management of construction projects.

    工程投资额预测市政工程管理中的一项重要工作

    youdao

  • So how to handle the relations between cost and quality is concerned by all the parties involved in a construction project.

    如何处理好二者关系参与工程建设的投资者施工单位极为关心的问题。

    youdao

  • It is always being revised, refined or changed in some way, unlike a construction project or developing a new dishwasher design.

    软件项目经常会被改进增强其他形式变更,而不建筑项目或设计洗碗机这类项目。

    youdao

  • Article 56 Surveying and designing units of a construction project shall be responsible for the quality of the survey and design.

    第五十六建筑工程勘察设计单位必须勘察设计质量负责

    youdao

  • The uncertainty in undertaking a construction project comes from many sources and often involves many participants in the project.

    建筑工程的理解的不确定性来源许多方面并且常常涉及到许多工程参与者

    youdao

  • In the case of a construction project failing to solicit sufficient public comments, they shall request the project to fulfill the task.

    发现建设项目充分征求公众意见应当责成建设单位征求公众意见。

    youdao

  • In the construction supervision system, it has profound significance for archives materials of a construction project to be managed well.

    建设监理制下做好建设项目档案资料管理具有重要意义

    youdao

  • A success in a construction project bid depends on proper applications of bid strategy and bid technique besides the strength of bidders.

    工程项目投标获胜不仅取决于各投标人实力,也取决于投标策略投标技巧是否运用得当

    youdao

  • Only with suitable methods and strategies established, the bidder may succeed in bid-ding for a construction project and make a higher profit.

    使建设工程投标者能够中标获得较高收益,就要讲究方法策略

    youdao

  • In practice, the investors often choose a construction project only by simple estimation rather by deep financial evaluation and risk analysis.

    项目实践中,投资者经常只是依据简单估算来进行项目的取舍并没有做深入的前期财务评价风险分析。

    youdao

  • The utility model relates to a fixing device of a reinforcing bar template in a construction project, particular a reinforcing bar fixing plate.

    实用新型涉及一种在建筑工程钢筋模板固定装置,特别涉及种钢筋固定盘。

    youdao

  • In this paper a construction project is regarded as a system that is discrete, dynamic, and stochastic and simulated using the principles of queuing theory.

    这个文件中有关建设项目视为一种制度离散动态的,随机模拟使用原则排队论。

    youdao

  • Risk analysis is an important aspect of the risk management for a construction project, and it is the powerful guarantee for a projects to achieve its target.

    建设项目风险分析建设项目管理一个非常重要方面,是项目取得既定目标的有力保障

    youdao

  • Pic.22 Indian children work nearby to their parents at a construction project in front of the Jawaharlal Nehru Stadium on January 30, 2010 in New Delhi, India.

    22 2010年1月30日尼赫鲁体育馆工地上,印度儿童父母身边工作

    youdao

  • The construction and installation cost is an important component of a construction project and is also the main object controlled by the whole engineering cost.

    建筑安装工程费用建设项目重要组成部分也是工程造价控制主要对象

    youdao

  • Article 18 the appraisal of the environmental impacts of a construction project shall not be a repetition of the appraisal of the environmental impacts of the program.

    第十八建设项目环境影响评价应当避免规划的环境影响评价相重复

    youdao

  • Article 18 the appraisal of the environmental impacts of a construction project shall not be a repetition of the appraisal of the environmental impacts of the program.

    第十八建设项目环境影响评价应当避免规划的环境影响评价相重复

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定