8d methodology for problem solving.
解决问题的8d方法。
一个瑕疵一8D报告。
Simultaneously needs the supplier to provide 8d, and takes this question.
同时需要供应商提供一份8d,并重视此问题。
Experience preferable with 8D problem solving, failure analysis, QC tools of PCBA, reliability testing.
有8D问题解决,品质不良分析,PCBAQC工具管理,可靠度测试经验优先。
Responsible for dimension checking, inspection on in-process parts, come out with 8D & dimension report;
负责模具制作过程中的模具零部件检验,分析8D报告和尺寸报告。
Customer RMA failure analysis and to follow up the 8D report as well as other work assigned by supervisor.
客退品不良分析和8D报告的跟踪。其他的上司安排的内容。
Start with a very light breath on an 8d note, then increase the pressure gradually until it sounds clearly.
以非常弱的呼吸来吹奏8d音符,然后逐步增加压力直到该音符听起来清晰。
Through example, establishing the 8d flow and introducing how to use RSN to analysis the FMEA, and how to use in the practical operation.
通过实际例子,建立8d流程,介绍风险评估系数如何分析潜在失效模式,以及如何运用于实际操作中。
Through the trajectory tracking of a planar 3-dof robot and the simulation examples of 8d-wmm implementation window, the algorithm feasibility is validated.
并通过平面3自由度机器人轨迹跟踪和8d -WMM执行窗口作业的仿真实例,验证了算法的可行性。
Through the trajectory tracking of a planar 3-dof robot and the simulation examples of 8d-wmm implementation window, the algorithm feasibility is validated.
并通过平面3自由度机器人轨迹跟踪和8d -WMM执行窗口作业的仿真实例,验证了算法的可行性。
应用推荐