There are 6 injection Wells in this unit, 5 Wells were selected to be carried out profile control by means of the decision factor.
从该单元的6口注水井中,根据决策因子优选了5口井进行调剖。
There are 6 injection Wells in this unit, 5 Wells were selected to be carried out profile control by means of the decision factor.
从该单元的6口注水井中,根据决策因子优选了5口井进行调剖。
应用推荐