• 验证项目应当包括属性中间精密度

    Validation criteria should include specificity, and intermediate precision.

    youdao

  • 选择50例健康人验证项目参考范围

    To verify the reference range interval by analyzing 50 healthy samples.

    youdao

  • 然后可以单击Next验证项目交换文件中的项目是否工作区匹配

    You can then click Next to verify that the projects in the project interchange file and the workspace match up.

    youdao

  • 开始创建一个验证项目LifecycleManager需要连接每个CognosBI环境收集信息

    To begin creating a validation project, Lifecycle Manager collects information from each Cognos BI environment that it will connect to.

    youdao

  • 年来非常荣幸地参与使用IBMWebSphereDataPower多个概念验证项目,其中的客户主要银行保险公司

    For three years now, I’ve had the pleasure of working on several proof of concept projects that have used IBM WebSphere DataPower, primarily for banks and insurance firms.

    youdao

  • 有时候可以要求服务供应商IBMBusinessConsultingServices进行一个概念验证项目IT人员参与其中,以从中学习所必需技能

    On occasion, a services vendor, such as IBM Business Consulting Services, can be engaged to carry out a proof-of-concept project, and IT personnel participate, learning necessary skills along the way.

    youdao

  • 如果能说明什么的话就是学校赞助体育项目提供了投入相称资产回报。

    If the empirical evidence points to anything, it points towards school-sponsored sports providing assets that are well worth the costs.

    youdao

  • 这些类型,有文本描述补充说明,应该功能验证测试团队这个项目周期中工件测试用例提供充分信息

    These types of diagrams, complemented by text descriptions, should provide sufficient information for the Function Verification Test team to build test cases very early in the project lifecycle.

    youdao

  • 流程模型正式形成经过了验证后,可以将其作为项目下一阶段建模)的主要输入使用。

    The process models, when formalized and validated, serve as the main input for the next phase of a project, for example, use case modeling.

    youdao

  • 给出指导以及过程应该一个严密项目通过验证确保最终得到的系统满足期望

    The instructions and procedures given should be verified on a demo project in order to ensure that the final system fulfils your expectations.

    youdao

  • 每行中的其他项目表示插件验证属性数量以及每个严重性级别(错误警告信息)发现问题的数量。

    The other items in each row indicate the number of attributes verified by the plugin and the number of problems found at each severity level (error, warning, and info).

    youdao

  • 步骤发送带有构建结果电子邮件,项目团队成员验证结果。

    This step sends an E-mail with the build and verify result to the project team members.

    youdao

  • 在通过企业范围的业务模型得到验证合并之前这个被完成分析项目中获得。

    This completed analysis is then harvested from the project before being validated and merged with the enterprise-wide business model.

    youdao

  • 用于验证现有业务数据是否支持数据仓库项目业务需求自然检查点

    It is a natural checkpoint for verifying whether the existing business data supports the business requirements for data warehouse project.

    youdao

  • 通过管理用户其它需求关联的可以更好地管理项目,控制变更验证覆盖率

    By managing use cases in conjunction with other requirements your project can be better scope managed, change can be controlled and coverage can be verified.

    youdao

  • 该银行选择一个试验性项目验证sOA体系结构样式找出迁移SOA范例过程中可能出现任何技术组织问题

    A pilot project was selected to validate the SOA architectural style and to work out any technology and organizational issues while moving to this SOA paradigm.

    youdao

  • 项目采用指纹生物技术验证

    The program will use fingerprint biometric technology for the verifications.

    youdao

  • 项目分解成“设计”、“开发”、“验证连续工序板卡就在这些工序之间移动

    This project has separate and serial processes which they call "design", "development", "validation" etc., and the Kanban CARDS move between processes.

    youdao

  • 阶段检查如何计划过渡变化开端验证试验项目中的方法将其展开面向更为广泛的观众最终大量生产。

    The phases examine how to move from planning the change initiative, proving the approach on pilot projects, rolling out to a wider audience, and the final roll out.

    youdao

  • 使用文档项目菜单验证标签功能对标签文档的标签进行验证

    Tags in tagged documents can be validate using the validate Tags function under the document or Project menu.

    youdao

  • 原型负载测试项目早期阶段进行用于验证架构。

    The prototype and load testing is to be done in the early phases of the project in order to validate the architecture.

    youdao

  • 可以项目关闭jsp验证,方法为右键单击项目,然后选择属性

    You can turn off JSP validation at the project level by right clicking the project and selecting properties.

    youdao

  • 项目早期减轻了高风险包括验证所有在架构上重要项目决策

    It also mitigates high risks early in the project, including validating all architecturally significant project decisions.

    youdao

  • 创建文章教程验证XML工具安装项目目录里

    A tool for validating your XML was installed in your project directory when you created your new article or tutorial.

    youdao

  • 大部分就业援助项目建立实践验证的基础上,已经显示出积极的效果

    Most supported employment programs are founded on evidence-based practices that have displayed positive results.

    youdao

  • 可以验证来自项目工件对应的是否存在,方法是bindprops 中指定以下内容并运行绑定defaultOptions = –verifyPackage DETAIL。

    You can verify whether packages already exist for artifacts from your projects by specifying the following in the bindprops and then running bind: defaultOptions = –verifyPackage DETAIL.

    youdao

  • 创建用于CognosBI实例之间验证项目最佳实践同时提供两个环境

    At the time the project is created for validation between two instances of Cognos BI, it is a best practice that both environments be available.

    youdao

  • 项目完成可以验证是否获得预期结果,方法就是检查下面两个文件是否存在

    When the project is complete, you can verify that it had the intended results by checking for the presence of the following two files.

    youdao

  • 基于上述参数GenSequence实用程序服务器数据库(LSDB)连接验证给定属性与给定项目类型关联。

    Based on these parameters, the GenSequence utility will connect to the Library Server database (LSDB) and verify that the given attribute is associated with the given item type.

    youdao

  • PortfolioManagement方法第二实践集合即执行验证整个项目组合管理工作中的第二部分如下文所概括

    The second collection of practices in the Portfolio Management method, Execution and Validation, is the second part of the overall portfolio assessment effort, which is summarized as follows

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定