这一概念有多种形式,学者和政策制定者对理想项目的框架、范围和成本存在争议。
The concept has multiple forms, and scholars and policymakers argue about the shape, scope and cost of the ideal program.
如果您还不能准确地确定项目中的哪些部分需要通过软件完成、哪些部分需要通过硬件完成,则FPGA可能会是您的一个理想的选择。
If you haven't yet been able to tie down exactly what parts of your project need to be done in software and which in hardware, an FPGA is probably the ideal solution.
他说,日本理想的位置是帮助扩大此项目,因为它自身雄厚的美元储备。
Japan, he says, is ideally positioned to help expand the program because of its own massive dollar reserves.
当执行一个移植项目的时候,我们可以通过运行某些特定的活动实现理想的快捷途径。
When performing a migration project there are specific activities that one can run through that goes beyond the ideal fast-path track.
它的花费要比理想更慢而且有一些花在小价值的长期项目上。
It spends money more slowly than is ideal and spends some of it on projects of little long-term value.
理想状态下,这些资源将被准确锁定,专供项目使用,但在现实中则未必能实现这一目标。
While the ideal situation is to be able to lock down the exact resources for the project, it is not always realistic to attain that goal.
大多数项目都有上千各可动部件,每个部件多经常出现新的版本,而理想的情况下,每天都需要将它们集成到工作应用程序上许多次。
Most projects have thousands of moving parts, each frequently evolving with new versions, and which need to be integrated into a working application ideally many times per day.
我开始越来越多地思考这个项目的发展前景,它能服务的人群,以及它能实现的理想和价值。
And I started to think more and more about what this program could become. And the people it can serve and the values and the ideals that could also address..
我们曾经有一个项目,它需要非结构化的文本分析;uima似乎是理想之选。
In one of our projects, there was need for unstructured text analysis; UIMA looked like doing exactly what was needed.
就像你可以第1部分回想起来的,这个由多个部分组成的系列文章覆盖了项目的第1个阶段:以一系列需求、一个参考架构和代码(理想的可重用的)为结果的概念的验证。
As you may recall from part 1, this multiple-part article covers Phase 1 of the project: a proof of concept resulting in a set of requirements, a reference architecture, and (ideally reusable) code.
我从网上买了很多东西,并学习了很多课程和项目,多数效果都非常理想,当然也有一些是彻头彻尾的垃圾。
I've bought many things and taken many courses and programs on the Internet and most of them aren't very good. Some are downright junk.
与本地的年轻咨询师合作的过程中,我目睹了这些短期应急项目如何破坏了他们的工作和理想。
I worked with young local counsellors and saw how their work and ambitions were damaged by these short-term emergency projects.
这就意味着项目级的目标是非常理想的GQM分析开始点。
That means that project-level goals are an excellent place for GQM analysis to start.
图2:在一个理想项目上的反馈间隔。
这有时是作为功能性的一部分一起考虑(或者应该在理想的环境下)的,但是常常被忽视,以致于整个项目处于危险之中。
This is sometimes considered part and parcel with functionality (or should be in a perfect world), but is often ignored to the peril of the project as a whole. Some issues to consider here are
在一个理想的世界内,获取可能会将所有的项目模型变更带入企业模型中,然后企业模型就会覆盖最近获取的项目模型。
In an ideal world, the harvest would take all proposed project model changes into the enterprise models, and the enterprise models would then overwrite the recently harvested project models.
后来该项目中的一项后果是,实现的模板类并不能理想地适用于所有类型的通信技术。
A consequence that emerged later in the project was that the implemented template class was not ideally suited to all types of communication technology.
最理想的情况是在整个企业的上下文中定义业务术语,这会促使业务术语在所有项目之间保持一致。
The preferable scenario is where business terms are defined across the context of the entire enterprise, driving consistency of business terms across all projects.
理想的试点项目需要综合项目大小、项目持续时间、项目重要性以及业务发起人的参与度。
The ideal pilot project sits at the confluence of project size, project duration, project importance, and the engagement of the business sponsor.
这种评估理想情况下是根据项目计划和开发方法进行的(轻量级还是重量级)。
This assessment is ideally made by coupling task assignments from the project plan with the development methodology (lightweight or heavyweight).
理想的资源很有可能被用在另一个项目中,无法在需要的时间准确地提供给本项目。
It is highly probable that the ideal resource is engaged in another project and is not going to be available at the exact moment of need.
在理想情况下,可以通过这些层中的构件来配置特定于客户端或项目的任何组件和服务。
Ideally, any client or project specific components and services can be configured from the artifacts in those layers.
理想地说,上面所描述的工作由业务和IT经理、外部项目组合管理顾问,和领域专家的专门团队计划并执行。
Ideally the work described above is planned and carried out by a dedicated team of business and IT managers, external portfolio management consultants, and subject matter experts.
理想化的想法是,在创作和实施过程中,网页项目的大部分内容都能带上某种程度的人性的本质。但我们常常控制自己本该有的随意和个性。
Ideally, most of your web projects will take on some level of human nature during creation and implementation, but oftentimes, we must limit how casual and personal we can be.
在一个理想的小敏捷项目之中,您有小的交接,因为团队成员要扮演所有的项目角色(编写实例,开发代码,测试,等等)。
In an ideal small agile project, you would have minimal hand-offs, because team members tend to take on all project roles (write stories, develop code, test, and so on).
项目经理想要采用一个简洁的方法,以确保项目的关键需求得到了满足。
Project managers want a concise way to assure that their project's critical requirements are being met.
我们将要介绍JDIC 所提供的差不多每个组件,在理想情况下,这些将激发您足够的兴趣,让您将 JDIC应用到您的应用程序中,甚至有助于说服您也为这个项目做点贡献。
We'll touch on nearly everything that JDIC offers and ideally pique your interest enough to include it in your applications, or even help convince you to contribute to the project itself.
借助前沿且实用的理念和方法,采用高度协作的项目工作方法,我们的咨询工作帮助客户做出正确选择并下决心实施,直至取得理想的成果。
We deploy leading edge yet practical ideas and methods, and adopt a highly collaborative intervention approach, enabling clients to make choices, commit to actions and follow through to get results.
借助前沿且实用的理念和方法,采用高度协作的项目工作方法,我们的咨询工作帮助客户做出正确选择并下决心实施,直至取得理想的成果。
We deploy leading edge yet practical ideas and methods, and adopt a highly collaborative intervention approach, enabling clients to make choices, commit to actions and follow through to get results.
应用推荐