• TOC理论项目进度管理中的运用称为关键技术CCM。

    TOC's application in process management is intituled as CCM(Critical chain method).

    youdao

  • 亟待开发种科学、可行项目进度管理方法保证项目进度计划实现

    So we need to focus on a new and systematic method to guarantee the in-time completion of the projects.

    youdao

  • 方法运用能够提高项目进度管理精度保证项目可接受进度偏差范围完成

    The application of the method can help improve the accuracy of project scheduling management, ensure project completion within the acceptable deviation.

    youdao

  • 论文通过实例说明模型可以有效地缩短项目周期项目进度管理提供了新的思路

    By cases, this paper explains that this model can effectively shorten the project cycle and provide project schedule management with new thinkings.

    youdao

  • 挣得分析法作为现代项目管理一种管理方法项目进度管理费用管理中具有重要作用

    As a management way in modern project management, the method of earned value analysis plays an important role in time management and cost management.

    youdao

  • 研究了软件工程项目计划管理项目进度管理成本控制技术中小软件开发企业如何应用

    How to apply plan management, process management, control of cost of software engineering are studied in the middle and small software development enterprises.

    youdao

  • 论文最后部分讲述了项目成本管理项目人力资源管理项目进度管理项目沟通管理之前的关系

    The last part of the thesis introduced the relationships between the project cost management, project human resources management, project process management and project communication management.

    youdao

  • 首先本文描述项目进度管理作用以及江河公司Y BK- 2000项目加强进度管理的必要性。

    First, this article described the project progress management function, as well as rivers and streams company YBK-2000 project enhancement progress management necessity.

    youdao

  • 由于模糊系统可以作为任何非线性系统的万能逼近器,所以本文假定模糊控制可以应用项目进度管理系统中。

    This thesis makes the hypothesis that fuzzy control can also be applied to project scheduling management on the basis of fuzzy system being any nonlinear system's omnipotent simulator.

    youdao

  • 缓冲区设置关键链法项目进度管理领域一个技术突破,通过缓冲区项目进度进行监控具有实际应用意义。

    Buffer sizing is the breakthrough of critical chain in the area of project schedule management, and it makes a practical application on monitoring project.

    youdao

  • 介绍P3软件背景软件作为项目进度管理软件应用化肥”工程的思路、方法具体实施步骤。

    This paper introduces P3 software background and its application as managing project to "coal for oil" chemical fertilizer. Methods and their steps are interpreted.

    youdao

  • 他们不能提出正确问题估计项目进度并且他们不能提供适当管理指导

    They do not ask the right questions to gauge project progress, and they are ill-equipped to provide appropriate management guidance.

    youdao

  • 缺陷位置确定在Clearcase后,这个项目经理或者缺陷管理人员就可以Clearcase运行报告进度缺陷状况发布进行控制

    After the defect fix has been checked into Clearcase, the project manager or defect manager can run reports in Clearquest to monitor the progress and status of defects and issues.

    youdao

  • 项目管理中需要管理三角约束范围进度预算有时人们质量/资源加到约束)。

    Projects manage the triple constraint; scope, schedule, and budget (Sometimes people throw quality and/or resources in there too).

    youdao

  • 管理这个项目计划中,项目经理必须这个项目技术领导者一起合作评估工作完成进度

    In managing the project plan, the project manager must work with the technical leads of the project to assign work, and to assess work completion.

    youdao

  • 项目管理却不同,项目需要严密地管理范围进度预算因为它们结束项目决定因素。

    Contrasted with a project where scope, schedule and budget are tightly managed because they are what define the end of the project.

    youdao

  • 如果一个管理特许权确保项目能按照所有范围交付那么进度下降不能作为失败

    If a manager's charter is to ensure that a project delivers on all its scope, then a schedule slippage might not qualify as a failure.

    youdao

  • 首先而且也是最重要的项目管理需要教育指导委员会成员如何衡量进度唯一的有效方法能够工作软件不是签订文档

    First and foremost, project managers need to educate steering committee members about how to measure progress: The only meaningful way is to look at working software, not signed-off documents.

    youdao

  • 如果产生可能能够危害进度问题项目管理可以预先进行各个级别采取减小风险措施

    If issues arise that might jeopardize the schedule, project management can proactively take steps to mitigate risk at every level.

    youdao

  • 信封框架的层级上项目经理项目发起人一起管理项目产品关系确保项目范围进度预算受控的。

    It is at this level that the project Manger works with the project sponsors to manage the project and product relationship and works to ensure that the project scope, schedule and budget are managed.

    youdao

  • 项目管理必须履行职责:协调其它成员的工作以及负责进度项目阶段发布日期

    Project managers must do their work: coordinating others' work, and looking after schedules, project phases, and release dates.

    youdao

  • 通过经常确认项目管理方向包括业务用例预算进度范围——包括详细需求期望管理可以一个项目带来益处

    Expectation management can benefit a project by constantly validating its management directives, including the business case, budget, schedule, and scope — including detailed requirements.

    youdao

  • 一方面,项目管理更加关注资源进度成本等方面管理项目计划

    The project manager, on the other hand, is more concerned with managing the project plan in terms of resources, schedule, and cost.

    youdao

  • 集成项目计划确保团队之间相互依赖管理范围内项目能够按日程表进度进行以及不超出预算

    The integrated project plan ensures that dependencies between groups are managed and the project remains on schedule and within budget.

    youdao

  • 如果管理过至少一个项目那么当下项目经理你询问进度的时候,你就明白为什么需要这些数据。

    This way, the next time the project manager asks you for a status, you\\\'ll understand why.

    youdao

  • 随着科技飞速发展,以降低成本提高质量保证进度为目的的科学化工程项目管理技术得到越来越多的重视

    With rapid development of the high technology , the scientific engineering project management technology has been paid more and more attentions to decrease cost, increase quality and insure schedule.

    youdao

  • 随着科技飞速发展,以降低成本提高质量保证进度为目的的科学化工程项目管理技术得到越来越多的重视

    With rapid development of the high technology , the scientific engineering project management technology has been paid more and more attentions to decrease cost, increase quality and insure schedule.