协助成本对不同服务项目成本的控制,尤其在食品及酒类方面的成本。
Shall assist cost section to control of the costs of the different services, in particular the food and beverage cost.
设计对项目成本的控制是战略性、全局性的,而施工过程的管理对项目成本的控制是战术性、局部性的。
Designing is of strategic importance and of overall situation to the project cost, while the management of construction process is of tactics and partial.
因此要采取有效措施 ,从多个方面入手 ,加强对施工企业项目成本的控制 ,从而达到增加利润的目的。
Thus effective measures must be taken in many aspects to strengthen the control over project cost of construction enterprises for the purposes of profit increase.
但是使用到工时单,成本和日程安排等却使更重要的事情如项目利益、风险管理、持份者参与、质素、范围、目标控制等得不到应有的注目。
However, the use of time sheets, costs, and schedules far outweigh the more important issues like project benefits, risk management, stakeholder involvement, quality, scope, and objective control.
集团会继续推进它的成本控制,生产多样化以及区域管理项目。
The group will continue to press on with its cost savings, productivity and yield management programmes.
不同团队之间精确有效的交流,对于控制项目时间限制、风险和成本来说,十分关键。
Timely, accurate communication among disparate teams is critical to controlling project timelines, risks and costs.
我认为,控制成本是项目或组织运作不良的主要标志。
I think a cost focus is one of the main indicators that a project or organization is not going well.
实施商旅集中管理项目最主要的目标,是为了让企业可以控制成本,并通过可实施的旅游政策来执行与航空公司签订的协议。
The prime objectives of managed corporate travel programs have been to enable companies to control expenses and to fulfill agreements with airlines through enforceable travel policies.
质量活动必须使成本和进度处于项目的控制之下,以满足CMM的精神。
Quality initiatives must lead cost and schedule in the control of the project to satisfy the spirit of the CMM.
项目经理花时间做的事情包括:规划、管理、分派任务,控制范围、时间成本、质量、风险、资源和客户满意度。
The project manager spends time planning, managing, assessing, and controlling scope, time, cost, quality, risk, resources, and customer satisfaction.
订购原材料,包装等涉及到产品的相关项目,同时控制成本,并获得价格优势。
Ordering items pertaining to the manufacture of goods: such as raw material, packaging, etc. , while at all times controlling costs and obtaining price advantages.
这种思路的提出,可以规范钻完井项目成本控制方法,为项目降低成本、提高工作效率和管理水平具有一定的指导性。
Using this theory, the cost controlling method of drilling and completion projects can be regulated so as to reduce the project cost and make work and management more efficiency.
工程项目是施工企业经营效益的源头及成本控制的中心。
The engineering project is the construction enterprise effectiveness of operation source and the cost control center.
探讨了培训项目开展过程中培训成本控制的原则、程序和措施,以达到经济效益最优化,实现自立生存的最终目标。
Probed into principle, procedure and measures of training cost control in training program development to realize optimum benefit and final target of self existence.
施工阶段的成本控制是施工企业能否有效进行项目成本控制的关键。
The cost control in the construction phase is the key for construction enterprises effectively control project cost control.
这一论坛将重点分享如何实现商旅管理项目中各种潜在的成本节约,以及优化商旅成本控制的策略。
In this Forum, we will emphasize on sharing how to realize various kinds of potential cost saving in business travel management project, and strategies to optimize business travel cost control.
以费用为导向的建设项目计划和控制,侧重包含在最终成本估算内的成本项次。
Expense oriented construction planning and control focuses upon the categories included in the final cost estimation.
此文结合具体实例,从不同方面论述了加强工程项目成本控制的方法和途径。
This article, combined with specific instances, expounds in all respects the methods and ways to improve the cost control of engineering projects.
通过简单的外墙面涂白处理和增设木构架,最低限度地控制建筑改造项目的成本,并且获得一定的生态效益。
By simply painting the existing brick exterior white and adding the timber frame, the cost of renovating the building was kept to a minimum and a series of environmental benefits resulted.
关于工程施工项目成本控制的方法和原理,专家和学者多有论述,仁者见仁智者见智,如价值链分析法、量本利分析法、价值工程法、ABC分类法等。
There are more expositions on the principles and methods of cost control in construction projects, such as value chain analytical method, value project method and ABC taxonomy.
推动项目管理标准化和有效监督项目团队的项目计划管理、成本控制、与档案建设和维护等事项。
Ability to standardize and supervise project planning, cost control, project management and documentation carry out be project Managers.
分析了影响直接工程成本的各方面因素,提出了水利工程项目投标阶段进行直接工程成本控制的措施。
Various factors that impact direct project costs are analyzed, water project tender stage for direct project cost control measures are put forward.
时间、资源和成本是项目管理中需要控制的三大要素,统称其管理为数据管理。
Time, resource and cost are three key factors in project management whose management is called data management.
文章就当前施工项目工程材料成本管理中存在的问题及如何加强工程材料成本控制进行了探讨。
This article discusses the issue, which exist in the process of management of materials with how to enhance the cost control of engineering materials.
本文就施工项目部的资金管理及成本控制两方面分别进行了探讨和分析。
In this paper, construction project funds management and cost control, management of these funds is analysed.
项目成本管理包括与成本计划、成本估算、成本预算、成本控制相关的过程,用以确保项目能在核准预算内完成。
Project cost Management includes the processes involved in planning, estimating, budgeting, and controlling costs so that the project can be completed within the approved budget.
下面将从项目成本控制体系的项目投标和合同管理方面的一些问题结合本专业知识进行阐述。
Below will from the project cost control system of project bidding and contract management aspects of some problems with this professional knowledge in this paper.
摘要设计阶段是项目成本控制的关键环节,但该阶段成本控制缺乏理论先进、操作性强的方法。
Abstract: Design stage is a key link of project cost control, but there is no appropriate method which is advanced in theory and easy in operability.
本文就是从如何搞好成本控制的基准点出发,探讨项目中成本费用管理与控制的一般原则。
Starting from the basic point of how to do well in cost control, the paper explores the general principles of project cost management and control.
施工项目成本的有效控制与管理,关键在于能对成本影响因素进行准确的计量与分析。
The key to effective control and management of construction project cost lies in ability to measure and analyze accurately the cost factors influenced.