介绍了一种用于锅炉热负荷系统的复合控制器。
This paper describes a multiple controller for a boiler thermal load system.
为解决循环流化床锅炉发电机组负荷变化时的机炉协调控制问题,需要对发电机组的热功效率进行在线计算。
Online calculation of heat to power output efficiency of thermal generator set is important for the load coordination control in the CFB boiler thermal generator set.
通过试验研究了四角布置切向燃烧锅炉炉膛内的热负荷分布情况,比较了投入与不投入夹心风时炉内热负荷分布的变化。
An experimental study has been conducted of the thermal load distribution in a tangentially fired boiler furnace with burners installed at the four corners of the boiler.
电锅炉水储热技术是负荷侧调峰技术的一种。
Accumulating heat by water in electric heating boiler is one of the load regulating methods.
着重从锅炉设计不合理、热负荷过高、煤种变化、燃烧器的缺陷及节流阀结垢等方面分析了水冷壁爆管的原因,指出必须进行锅炉改造。
Cause analysis of the water cooled wall tube burst focused on irrational points of design, excessive thermal loading, changes of coal category, burner defects and deposits in throttle valves.
将热水锅炉的水循环由自然循环改为引射循环,强制提高回路的循环水量,使各回路的循环水量分布与其受热面的热负荷相匹配。
By replacing natural circulation with ejecting circulation, the circulating water in each loop can be increased and match with the heat load of related heating surface.
在投油稳燃时,运用上层油枪,使得上层一次风处热负荷会集,锅炉鼓风机部分炉温高,到达灰熔点,致使锅炉结焦。
In the oil combustion, using top gun, the upper wind at a heat load of boiler blower gathered, part of the furnace temperature is high, reaching the ash melting point, resulting in boiler coking.
在投油稳燃时,运用上层油枪,使得上层一次风处热负荷会集,锅炉鼓风机部分炉温高,到达灰熔点,致使锅炉结焦。
In the oil combustion, using top gun, the upper wind at a heat load of boiler blower gathered, part of the furnace temperature is high, reaching the ash melting point, resulting in boiler coking.
应用推荐