施工前,先清理现场,检查施工部位有没有水、暖、电等工种的预埋件,是否会影响板块的铺砌或铺粘;
Before the construction, it is necessary to clean the spot and check if there is Pre -embedded part of water heating electric and so on, if there is effect to lay and stick of the floor tile.
施工前,先清理现场,检查施工部位有没有水、暖、电等工种的预埋件,是否会影响板块的铺砌或铺粘;
Before the construction, it is necessary to clean the spot and check if there is Pre -embedded part of water heating electric and so on, if there is effect to lay and stick of the floor tile.
应用推荐