• 施工采用了钢管高压防渗墙、槽内降水、槽外注水回灌,外加复合土钉墙支护措施保证基坑开挖。

    In construction, supporting measures such as steel pipe pile, high-pressure impervious board wall were adopted, ensuring the excavation of base pits.

    youdao

  • 施工采用了钢管高压防渗墙、槽内降水、槽外注水回灌,外加复合土钉墙支护措施保证基坑开挖。

    In construction, supporting measures such as steel pipe pile, high-pressure impervious board wall were adopted, ensuring the excavation of base pits.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定