兴建中的喜灵洲避风塘和位于西贡区的3个公众码头,则预期于1998年落成。
It continued with the construction of the Hei Ling Chautyphoon shelter and three public piers in the Sai Kung area, all of which are due to be completed in 1998.
新避风塘已在1991年初启用,而旧避风塘的填海工程已于1997年八月完成。
The new typhoon shelter was put into use in early 1991, while reclamation of the old typhoon shelter was completed in August 1997.
而这些场景还与在建中的观塘海滨活化串联起来,未来将会围绕观塘避风塘形成一个完整的绿色环线。
Together the scenes join the Kwun Tong waterfront revitalization and will complete a green loop around the Kwun Tong typhoon shelter.
而这些场景还与在建中的观塘海滨活化串联起来,未来将会围绕观塘避风塘形成一个完整的绿色环线。
Together the scenes join the Kwun Tong waterfront revitalization and will complete a green loop around the Kwun Tong typhoon shelter.
应用推荐