• 可能能够完全控制进度可以随时管理行动计划

    You might not always be able to completely control your progress, but you can always take care of your actions.

    youdao

  • 项目实施制定具体施工方案项目执行过程中安装进度计划进行调整控制

    When the implementation of the programme and formulate specific construction project on the installation progress plan and to make an adjustment, control.

    youdao

  • 同时,对项目计划进度控制过程使用的具体方法进行了研究,诸如swot分析SWART原则WBS分解

    Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc.

    youdao

  • 在编制计划可以很方便调整、优化施工进度计划,在施工控制阶段可以直接指挥生产控制施工进度

    It may be used to adjust and optimize construction schedule planning, also manage production and control construction schedule in construction controlling stage.

    youdao

  • 对于进度控制可以项目活动实际进度项目的计划进度进行比较监督项目的进度实施。

    For schedules, progress on individual activities can be compared with the project schedule to monitor the progress of activities.

    youdao

  • 介绍了应用计算机技术实现基本建设过程计划进度控制跟踪管理理论实践

    The theory and practice of realizing the plan progress control of basic construction process and tracing management with computer technology were introduced.

    youdao

  • 制定套科学高效项目实施计划并按计划进行进度控制成功实施项目管理,使工程按期投产的主要因素。

    It is crucial for successful project management and schedule control to have a scientific and efficient project execution plan.

    youdao

  • 研究了软件工程项目计划管理、项目进度管理、成本控制技术中小软件开发企业如何应用

    How to apply plan management, process management, control of cost of software engineering are studied in the middle and small software development enterprises.

    youdao

  • 根据生产计划组织员工生产,控制生产进度质量,以完成产量要求

    Organize and direct the production according to plan, control the production schedule and quality to achieve the production goal.

    youdao

  • 项目管理就是项目活动计划进度安排控制监督沟通激励

    Project management includes planning for the project and the schedule, controlling, supervising, communicating and encouraging when the project is on-going.

    youdao

  • 项目实施制定具体施工方案项目执行过程中安装进度计划进行调整、控制

    Construction of the project implementation, to develop specific programs and project implementation process on the installation schedule and make adjustments to control.

    youdao

  • 介绍了硫磺装置组成安装工艺特点施工进度计划质量控制检查

    Composition, installation procedure and features, construction schedule and quality control and inspection of sulphur-burning sulphuric acid plants are reviewed.

    youdao

  • 项目实施制定具体施工方案项目执行过程中安装进度计划进行调整、控制

    Construction of the project implementation, to develop specific programs and projects in the implementation process on the installation schedule and make adjustments to control.

    youdao

  • 软件项目管理过程中,项目进度计划控制管理决定项目能否顺利实施关键内容

    It is known that the vital elements in managing software project must be planning and controlling of the project.

    youdao

  • 实例研究表明本文提出方法更好地计划控制项目费用进度目标

    The case study indicates that the method proposed in this article can effectively plan and control project cost and schedule objectives.

    youdao

  • 编制工程进度计划计划控制阶段工期如期完成

    Work out monthly progress plan and weekly progress plan to ensue the construction schedule in different construction stages to be completed on time.

    youdao

  • 海洋石油工程项目进度控制管理阐述设计阶段网络计划编制、设计过程进度控制方法手段

    By using a real case of an offshore oil project as example, this paper presents the method and approach utilized in the process of framework planning and design stage for schedule control.

    youdao

  • 同时,对项目计划进度控制过程使用的具体方法进行了研究,诸如swot分析SWART原则WBS分解

    Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc. in this paper.

    youdao

  • 任务进度计划模板RUP一次迭代过程中对团队成员如何控制工作提供有限支持,而RUP的一次迭代可能持续数月

    Task and schedule planning template. The RUP provides limited support to team members on how to manage work within an iteration. In the RUP, iterations can last for weeks or months.

    youdao

  • FIDIC合同条件下工程进度控制主要包括有关工程进度计划管理工程延误、工程延期规定

    Under FIDIC condition of contract, the project progress control mainly includes project progress management, project delay and project extension stipulation.

    youdao

  • 进度控制方面设计项目进度控制程序,利用PROJECT工具进行了计划提出进度控制步骤

    In the progress controlling aspect, it designs the procedure of project progress controlling, planning with project tool and advances the steps of progress controlling.

    youdao

  • 负责项目工作计划进度质量进度目标完成情况,具体制定调整控制项目运行

    Take charge of project schedule, quality, progress and accomplishment, lay down, adjust and control the operation of the project.

    youdao

  • 有效组建项目组推动项目品质质量完成目标有效控制计划进度

    Can effectively set up the project team, and promote the quality of projects, quality and objective, the effective control of plans and progress;

    youdao

  • 计划进度控制成本控制质量控制安全控制工程项目管理重要组成部分

    Plan and schedule control, cost control, quality control and safety control are important parts of project management.

    youdao

  • 负责对本项目进度、质量、成本等实施计划组织协调控制决策项目要素实施全过程动态管理

    The development putting the entire proceeding into practice manages the plan, organization, coordination, under the control of and every key element making policy, to the project.

    youdao

  • 程序是对CHRP-PC-PP-0001对承包商项目控制要求程序中的计划进度进一步定义补充

    This procedure further defines and supplements the Planning and Scheduling requirements found in Procedure No. CHRP-PC-PP-0001, Project Controls Requirements for Contractors.

    youdao

  • 文章详细阐述了法进行费用进度综合分析控制对已完工作预算费用、计划工作预算费用已完工作实际费用的分析与控制

    This paper elaborated the comprehensive analysis and control progress on the cost by earned value management which means analyzing and controlling the budget and actual costs.

    youdao

  • 属于工作分解结构底层组成部分的计划工作叫做“工作细目”,可以安排进度中,估算费用监视控制

    The planned work contained within the lowest-level WBS components, which are called work packages, can be scheduled, cost estimated, monitored, and controlled.

    youdao

  • 生产计划跟踪生产进度控制物料如果在线出现异常及时反馈计划以便重新调整计划

    Following up the production progress and control material according to production plan by LGC. Leader will feedback to planner in time if any unusual question in line so as to readjust the plan.

    youdao

  • 应用项目网络技术制订BPR进度计划,以计划控制BPR项目进度盐业企业重组项目可行

    Application for project network technology to develop project plan, and control the progress of BPR projects, it is feasible for salt enterprise restructuring projects.