工程施工进度风险分析计算是施工进度控制中的重要环节。
In the control of construction schedule for hydropower projects, risk analysis of the schedule is a key.
在此基础上,提出了航空型号研制项目管理的进度控制模型。
On the basis of that, the aviation model development project management schedule control framework was proposed.
通过理论运用的实证分析,提供订单进度控制的方法与模型。
The article offers some measures and models for the controlling of the order′s schedule through analyzing an example by the theory.
本文针对航空产品特点,对项目运行过程进度控制技术进行研究。
Based on the characteristics of Aviation products, this paper mainly focus on the research of schedule control technology in the process of project running.
总结分析是对进度控制进行评价的前提,是提高控制水平的阶梯。
To make a summary is a precondition of appraising the progress management and a ladder of improving controlling level.
重点分析了运用“赢得值评估原理”实现工程项目进度控制的方法。
Methods for realizing project schedule control using the "earned value evaluation principle" were specially analyzed.
文章把对工期的控制作为进度控制的重要指标来论述并提出相应建议。
The time limit for the control as an important index of progress control to discussed and puts forward the corresponding proposal.
深化项目法施工,加强工期控制和进度控制,实现企业效益的最大化。
In order to increase the level of project construction, this paper proposed the strategy of intensifying the time limit control and cost control.
因此,对建设工程施工进度控制进行探索和研究,具有十分重要的意义。
Therefore, to research and explore the construction project construction progress control, has the very vital significance.
从工程的进度控制、成本控制、质量控制方面探讨了搞好施工管理的对策。
This paper probes into the countermeasures for doing well the construction management from aspects of the schedule control, cost control, and quality control, etc.
文中就现代办公环境下的项目管理和设计进度控制工作提出一些想法,供商榷。
The paper puts forward some ideas on project management and design schedule control in modern office environment.
对相关景观绿化工程项目进行进度控制、质量控制、安全控制及经营管理核算。
Progress control for related Landscape planting projects, Quality Control, Safety Control and Management Accounting.
介绍了应用计算机技术实现基本建设过程计划进度控制和跟踪管理的理论及实践。
The theory and practice of realizing the plan progress control of basic construction process and tracing management with computer technology were introduced.
计划与进度控制、成本控制、质量控制和安全控制是工程项目管理的重要组成部分。
Plan and schedule control, cost control, quality control and safety control are important parts of project management.
加强施工进度控制,按合同工期履约交竣工,是施工企业生产组织的重要工作内容。
Strengthening construction plan commanding and finishing construction on time are important contents in producing organization of construction company.
WAPI项目进度控制是基于关键链管理的进度控制,核心是对缓冲的管理和控制。
The WAPI project schedule control is based on critical chain project management. The core is the management and controlling of buffer.
进度管理是项目管理的一个重要分支,进度控制是保证项目按期完成的关键管理环节。
Progress management, an important branch of project management, is the key management tache ensures the project completed on time.
结合青岛市福彩南山养老院工程,与施工单位共同对如何做好进度控制工作进行了一些探索。
In the construction process of the old people's home of Nansan, we seek after some methods to control the construction schedule better together with the construction unit.
本文就如何进行和提高控制因素中的成本控制、质量控制、进度控制等给予了本人的一些建议。
This article gives some Suggestions about how to conduct and improve the cost control, quality control and progress control in control factors.
摘要:根据建设项目进度控制的功能需求,提出基于BIM的进度控制平台构架以及实施流程。
Abstract: According to functions of progress control, proposes the structure and implementation process of progress management platform based on BIM.
其三,重点研究了网络企业项目控制管理,包括进度控制管理、成本控制管理和质量控制管理。
Third, project control management of network enterprise is researched, including the progress control management, cost control management and quality control management.
通过分析专业实际进度与专业计划进度的差距,结合实际找到适合本项目特点的进度控制方法。
By analyzing the difference of the actual schedule and plan, combined to the actual cases, found the schedule control methods which fit for the characteristics of this project.
最后在前面研究结果的基础上,运用项目进度控制理论,提出进度控制的具体方案和保障措施。
Finally, in the previous research foundation, this paper has put forward specific schedule control programs and measures in use of the schedule control methods and tools.
他们主动掌握自己的进度控制,使他们处于最佳,而不是让他们的日程安排,以控制他们和他们的家庭生活。
They proactively take control of their schedule so that they are at their best, rather than allowing their schedules to control them and their family life.
对于进度控制,可以将项目活动的实际进度和项目的计划进度进行比较,以监督项目的进度实施。
For schedules, progress on individual activities can be compared with the project schedule to monitor the progress of activities.
从工程监理的角度,阐述了西南铝热连轧工程进度控制的特点、控制的方法以及取得的显著效果。
The characteristics and controlling method of hot tandem program in SWA and its obvious effectiveness are expounded from the view of progress supervision and management.
其次,引入动态控制的原理,用进度控制为工具,不断的寻求进度与成本之间最佳的协调点的方法。
Second, the introduction of dynamic control theory, with progress control as a tool for continuous progress and costs of the coordination point between the best approach.
阐述当前国际通用的赢得值评估原理,以及如何将赢得值与项目进度控制和费用控制有机地联系起来。
Present international conventional "earned value evaluation principle" as well as how to combine the earned value with project schedule control and cost control organically were also expounded.
事中成本控制除了要重视质量控制和进度控制,还要重视招投标控制,因为这是选择合作伙伴的过程。
In the performing cost control phase manager not only think lot of quality control and schedule control but also inviting public bidding control which is a process of choosing partner.
文章基于预测技术,建立了设备工程进度控制的模型,并提出了设备工程进度目标控制界限的确定方法。
Based on forecast technique the time control models are built in the equipment engineering supervision. Then a novel method is proposed for the time control boundary.