简述了运行目标和达到……的各种途径。
Performance goals and various approaches to...; are briefly described.
运行目标的方法是先运行构建脚本,再选择执行“tests”目标。
To run the target, run the build script, and select the 'tests' target to execute.
虚幻的所有可用测试的100%的运行目标常常看起来非常接近,但是却难以达到。
The illusive run target of 100% of all available tests often seems excruciatingly close but unattainable.
程序中的每个线程都显示为树中的一个节点,Debug视图显示了每个运行目标的进程。
Each thread in your program appears as a node in the tree, and the Debug view displays the process for each target you're running.
一家公司必须建立战略和运行目标,然后在选择最能反映这些目标的关键绩效指标。
A company must establish its strategic and operational goals and then choose the KPIs which best reflect those goals.
我们团队的每位成员都具有强烈的团队合作精神,并致力于公司优质的设计成果及运行目标。
Every member of our team contributes to our company's financial and operational goals and must be a good participative team player.
这样做将调用项目的GWT托管模式(完成一次此操作后,单击Run将像任何其他Eclipse运行目标一样运行)。
Doing so invokes GWT hosted mode for your project. (After doing this once, clicking run will work just like any other Eclipse run target.)
在很多应用场合中,要求多台步进电机在运行目标距离不同的情况下,能同时启动、加速、高速、减速、制动停止。
In many applications, under the circumstances of different target distances, more than one step motor are required to start, accelerate, high speed, decelerate, brake to stop simultaneously.
关键绩效指标“是一家公司或某一个行业,为了实现组织战略和运行目标,考评或比较绩效所采用的一组量化测度指标。”
A set of quantifiable measures that a company or industry USES to gauge or compare performance in terms of meeting their strategic and operational goals.
因为编译是按程序的静态顺序线形扫描程序的,而非动态顺序重复翻译,使用编译程序时,只需对源程序编译一遍,以后每次只运行目标程序。
Because compiler scan program with static order of program, not dynamic order. while using compiler, compile source program only one time, run more times.
现在您需要打包ExecutionServer,方法是打开build/build.xml并运行目标包 package-execution-server-ear。
Now you need to package Execution Server by opening build/build.xml, and running the target called package-execution-server-ear.
尽管一些部署流程只在某些环境中运行,但是所有流程应该能够在任何目标环境中运行。
Although some deployment processes can run in certain environments, all processes should be capable of running in any target environment.
使用合适的标签来为其余的4个扩展卡创建列,以运行测试目标。
Create columns for each of the other 4 runs with labels appropriate to the run test objective.
需要创建一个可部署的EAR文件,然后将其部署在目标运行时环境中。
A deployable EAR file needs to be created and deployed in the target run time environment.
当源活动结束运行时,链接另一端的目标活动便开始运行。
When the source activity finishes running, the target activity at the other end of the link runs.
它依赖许多按以下顺序运行的其他目标:清理、初始化、签出、构建、安装、启动、停止和卸载。
It has dependencies to a number of other targets that are run in this sequence: clean, init, checkout, build, install, start, test, stop, and uninstall.
所依赖的目标将按指定的顺序运行,然后将运行全部目标。
The dependent targets will be run in their specified order, and then the all target will run.
将前面定义的服务器运行时设置为目标运行时。
Set the server runtime you defined previously as the target runtime.
在执行迁移之后,将在目标环境中运行这些BPEL实例。
After performing the migration, these BPEL instances will be worked on in the target environment.
具体来说,需要指定运行攻击所针对的目标IP地址和端口。
Specifically, you must specify the destination IP address and port against which to run the exploit.
运行日志包含目标系统验证过程中写入控制台日志的事件。
The runtime log contains events written to the console's log during the course of the target system's verification.
为了能使基于动作的例程运行,需要向描述目标服务的WSDL添加一点东西。
In order to make the action-based routine work, a slight addition is required to the WSDLs describing the target services.
这个阶段的主要活动包括:后期测试,批准、运行和目标,评价和回馈。
The key activities and objectives during this stage are: Final testing, approval and launch and Targets, evaluation and feedback loops.
构建程序会根据应用的目标运行平台创建核心组件和必要的插件。
The building procedure creates the core components and the necessary add-ins based on the platform the application is supposed to run on.
尝试在该文件夹中运行Ant目标,如清单1所示。
Try to run an Ant target in this folder, as illustrated in Listing 1.
在一个DOS控制台中,运行ant目标ant startdb。
这意味着在运行pydoc目标之前,Ant必须保证init和compile目标已经运行,如果没有,则首先运行这两个目标。
This means that prior to running the pydoc target, Ant will make sure that the init and compile targets have already been run, and will run them if not.
要运行multiproject:site目标,需要为每个项目运行站点和dashboard: report -single两个目标。
To run the multiproject: site goal, the site goal and the dashboard: report-single goal run for each project.
此执行可以为部分执行(运行Ant目标的子集),也可以完全执行。
This execution can be partial (running a subset of the Ant targets) or full.
此执行可以为部分执行(运行Ant目标的子集),也可以完全执行。
This execution can be partial (running a subset of the Ant targets) or full.
应用推荐