• 要求执行72小时更长时间负载测试

    This requires execution of load tests of 72 hours or longer.

    youdao

  • 性能测试一个应用程序包括用户负载测试

    Performance testing an application also includes user load testing.

    youdao

  • 许多前端负载测试工具强调提高到达产生负载

    Most front-end load testing tools emphasize increasing the arrival rate to produce load.

    youdao

  • 负载测试客户机机器完全专用负载测试任务

    The load testing client machines should be dedicated to the sole task of load testing.

    youdao

  • 安排CruiseControl每天运行负载测试

    Scheduling CruiseControl to run load tests daily

    youdao

  • 原型负载测试项目早期阶段进行用于验证架构。

    The prototype and load testing is to be done in the early phases of the project in order to validate the architecture.

    youdao

  • Tsung一个开源多协议分布式负载测试工具

    Tsung is an open source, multi-protocol, distributed load testing tool.

    youdao

  • 但是新的光纤中枢应该新的应用程序硬件进行负载测试

    But the new fiber-optic backbone should be load tested with new applications and hardware.

    youdao

  • 负载测试每个设置重复两次,得到的结果记录在下中。

    Load tests were repeated twice for each set up and results were recorded in the following tables.

    youdao

  • 传统负载测试工具作为代理程序台客户机机器上运行

    Conventional load testing tools run as agents on several client machines.

    youdao

  • 修复负载测试场景期间过剩CCRPC过程创建问题

    Fixed a problem of excessive CCRPC process creation during high concurrent load test scenario.

    youdao

  • 专用负载测试机器不同性能测试运行之间提供了一致性

    Dedicated load testing machines provide consistency between the separate performance test runs.

    youdao

  • 负载测试会影响整个应用程序所以整个团队都会希望看到结果

    Load testing affects the entire application, so the whole team will want to see the results.

    youdao

  • 是否能够通过一位虚拟用户使用不同IP远程运行负载测试

    Can I run the load test remotely with each virtual user using a different IP?

    youdao

  • 进行性能负载测试的目的发现应用程序中与负载有关的问题

    Performance and load testing is performed to find load-related problems in applications.

    youdao

  • 运行系统测试环境相比应用程序进行负载测试的频次更少

    Typically, an application is load tested less frequently than it is run on the system test environment.

    youdao

  • 服务器性能描述ApacheJMeter 进行负载测试

    Server performance characterization: Load testing with Apache JMeter

    youdao

  • 负载测试中,多个用户同时访问程序模拟预期软件程序使用情况

    In load test, multiple users access the program concurrently to simulate the expected usage of a software program.

    youdao

  • 讨论区中,可以讨论一般性性能测试vu脚本以及负载测试主题

    General performance testing, VU scripting, and load testing topics are also discussed in this forum.

    youdao

  • 估算测试数据需求确定创建足够有效测试数据进行容量负载测试

    Estimate the test data requirements and identify ways of creating an adequate volume of valid test data for volume and load testing.

    youdao

  • 还有负载测试客户机必须能够生成装入涉及应用程序所需正确类型请求

    Also, the load test client must be capable of generating the appropriate type of request needed for loading the application in question.

    youdao

  • 满负荷执行广泛负载测试验证时间内没有系统性能降低很重要

    It's also important to perform extensive load testing under a full load to verify that there is no system or performance degradation over time.

    youdao

  • 使用自动构建运行负载测试时,将其安排某个周期运行比如每晚运行一次

    Once you get a load test running with an automated build, schedule it to run on a periodic basis, such as nightly.

    youdao

  • 垂直负载测试证实通用桅杆系统的完全扩展,同时支持有效载荷可达600

    Vertical load testing has verified fully-extended CMS operation while supporting payloads up to 600 pounds.

    youdao

  • 只有通过大规模负载测试,才有可能客户发现这些错误之前它们出来。

    Only through large scale load testing can these bugs be found before your customers find them.

    youdao

  • 当然大多数准确测量来自模拟生产条件负载测试正确评估这些大小

    Of course, the most accurate measurements come from a load test that simulates production conditions to correctly evaluate the size of these pools.

    youdao

  • 显示了每个运行负载测试以及测试状态时间所有测试聚合状态和时间。

    It displays each of the load tests run, along with test status, time, and aggregate status and time of all of the tests.

    youdao

  • 我们测试主要非功能领域可用性性能(负载测试),我们将在下面进行讨论

    The primary nonfunctional areas we tested were usability and performance (load tests), as discussed below.

    youdao

  • 同时提供GUI命令行两种调用方式,可以执行测试计划定义各种负载测试

    It provides both GUI and command-line invocation facilities and allows the execution of various load tests which can be defined by using a test plan.

    youdao

  • 一个成功项目门户项目所做负载测试数量之间几乎存在着一一对应的关系。

    Answer: There is almost a one-to-one correlation between a successful project and the amount of load testing done on the portal project.