• 导电炭黑要求试验方法符合1规定。

    The requirements and test methods of conductive carbon black conform to the requirements of Table 1.

    youdao

  • 电影摄影安全电影胶片。要求试验方法

    Cinematography. Motion - picture safety films. Requirements and methods of testing.

    youdao

  • 试验技术要求试验金属丝网试验用筛。

    Test sieves. Technical requirements and testing. Test sieves of metal wire cloth.

    youdao

  • 石膏砌块用石膏基粘合剂定义要求试验方法

    EN 12860: Gypsum based adhesives for gypsum blocks – Definitions, requirements and test methods;

    youdao

  • 建筑阀门供水减压阀复合供水减压阀。要求试验

    Building valves - water pressure reducing valves and combination water pressure reducing valves - Requirements and tests.

    youdao

  • 家具教育机构桌椅第2部分:安全要求试验方法

    Furniture - Chairs and tables for educational institutions - Part 2: safety requirements and test methods.

    youdao

  • 听力保护器安全要求试验第5部分有源降噪耳罩。

    Hearing protectors - Safety requirements and testing - Part 5: active noise reduction ear-muffs.

    youdao

  • 建筑五金窗户配件要求试验方法把手

    Building hardware, fittings for Windows and door height Windows - requirements and test methods - casement fastener handles.

    youdao

  • 建筑五金舌-机械锁、锁舌扣板-要求试验方法

    EN 12209:2003 Building hardware locks and latches-Mechanically operated locks, latches and locking plates-Requirements and test methods.

    youdao

  • 射频同轴电缆组件第1部分:一般规范一般要求试验方法

    Radio frequency and coaxial cable assemblies - Part 1: Generic specification - General requirements and test methods.

    youdao

  • 滑雪板。固定安装部位。第1部分:无插件滑雪板的要求试验方法

    Snowboards. Binding mounting area. Part 1: requirements and test methods for snowboards without inserts.

    youdao

  • 潜水第3部分自动加热冷却服装(装置)。要求试验方法

    Diving suits - Part 3: actively heated or cooled suit (systems) - Requirements and test methods.

    youdao

  • 固定消防系统气体灭火系统用元件第13部分止回要求试验方法

    Fixed firefighting systems - Components for gas extinguishing systems - Part 13: requirements and test methods for check valves and non-return valves.

    youdao

  • 轿车收音机同轴天线连接器第2部分:特征性能要求试验技术勘误1

    Car radios - Coaxial aerial connectors - Part 2: Characteristic values, performance requirements and tests; Technical Corrigendum 1.

    youdao

  • 防护滚轴运动设备使用者用腕部掌部膝部肘部防护装置。要求和试验方法

    Protective clothing - Wrist, palm, knee and elbow protectors for users of roller sports equipment - Requirements and test methods.

    youdao

  • 介绍CL81型高压聚酯电容器行业标准关于阻燃试验技术要求试验方法

    Technical requirements and method of flame retardation test in industriial standard of type CL81 highvoltage polyester film capacitors are described.

    youdao

  • 建筑物大型屋顶防火安全下部起火第1部分:定义要求试验。封闭式屋顶

    Fire safety of large roofs for buildings - Fire exposure from below - Part 1: Definitions, requirements and tests; roof areas without openings.

    youdao

  • 低压保护装置第21部分:与电信信令网络连接的电涌保护装置。性能要求和试验方法

    Low voltage surge protective devices - part 21: surge protective devices connected to telecommunications and signalling networks - Performance requirements and testing methods.

    youdao

  • 介绍GB 14 0 4 8 4短路保护装置(SCPD)协调配合要求试验方法,叙述SCPD断路器熔断器时选配方法。

    The coordination requirements and test methods of short circuit protective device (SCPD) in standard GB14048.4 are introduced. The selection methods of circuit breaker or fuse as SCPD are described.

    youdao

  • 试验证明,方案1生产传动轴管综合性能最好满足使用要求取得较显著经济效益

    The experiments show that the comprehensive properties of pipes produced by the process no. 1 can best meet the requirements of application with evident economic results.

    youdao

  • 试验地点没有使用研究产品处理需要符合相关的官方要求主办方要求

    That the disposition of unused investigational product (s) at the trial sites complies with applicable regulatory requirement (s) and is in accordance with the sponsor.

    youdao

  • 试验结果表明可控活化热氛围燃烧试验系统设计达到安全要求设计目的

    The experiment results show that the designed CATAC system meets the safety request and design target.

    youdao

  • 试验过程严格按照GONG技术要求步骤进行

    The experiment was done strictly according to the requirements and steps of GONG technique.

    youdao

  • 数据库系统原理试验各种试验要求方法

    Principles of Database System of testing, a variety of test requirements and methods.

    youdao

  • 根据试验要求厂房结构形式,本论文的模型试验在发电机层采用拱顶送风系统风口对称均匀布置选取5风口布置方案

    Adopt arch crest as air supply system, arrangement vents symmetry, and select 5 kinds of vents to arrange the project, according to the experiment request and factory premises construction form.

    youdao

  • 通过烟尘样品试验比较,提出了烟尘样品的实验室质量控制要求方法

    The paper describes the specifications and methods for quality control for the analyses of smoke samples, after tests and comparison of different smoke samples.

    youdao

  • 通过现场调试试验运行表明系统设备达到设计要求指标。

    The commissioning test and commercial operation indicate that all the systems and equipment have satisfied the design requirements and targets.

    youdao

  • 通过现场爆破试验碾压试验研究坝体填筑材料密实度要求和碾压参数

    Then the compactness postulate and roller parameter of embankment material are researched by blasting test and roller test on site.

    youdao

  • 介绍系统的测量原理方法、系统基本构成、基本技术指标要求所采用的技术方案,给出系统激光雷达进行对比试验的结果。

    The basic principle, method and technology scheme are discussed, and then the comparison experiments between the system and a lidar system are carried out.

    youdao

  • 根据工况要求有关流动性以及流量试验结果设计出一种实现定量控制功能的振动给料斗。

    A vibratory feeder that can control discharge of iron powder quantitatively is designed based on working conditions and experimental results.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定