编制工程进度月计划、周计划以控制阶段工期的如期完成。
Work out monthly progress plan and weekly progress plan to ensue the construction schedule in different construction stages to be completed on time.
建立了粒状药与管状药组成的混合装药的多相流内弹道理论模型,编制工程实用的软件系统。
The multi phase flow interior ballistic model for grain and stick propellants are established, a practical engineering software system is completed.
PERT技术的网络计划软件是基于编制工程进度计划要求而开发的一种新兴的工程管理技术软件。
Network planning software based on PERT technology is a new kind of project management software developed for compiling schedules for projects.
本文通过对国际社会编制工程造价惯例的介绍,阐明了“实物量法”编制工程造价的基本方法和步骤。
This paper illustrates the basic means and procedures of material measuring in drawing up engineering cost by introductions of international practice on engineering cost drawing-up.
新版地图编制工程师向记者介绍,此次修改的地图有《沈阳市地区图》、《大沈阳城区图》、《沈阳市辖区图》以及《沈阳市交通旅游图》。
Engineers of the new map told reporter that the maps published include Shenyang City Areas map, Shenyang Urban Area map, Area map under Shenyang's Jurisdiction and Traffic map of Shenyang City.
一个工程只能编制一个标底。
该角色可能由工程、产品和项目经理、QE,或文档编制部门来代表。
This role may be represented by engineering, product and project managers, QE, or documentation.
详细描述阶段目的是将系统的关键部分逆向工程,并且重新编制它们的高层架构。
The elaboration phase is intended to reverse-engineer the critical parts of the system and redocument their high-level architecture.
在详细描述阶段的末尾,应该编制出要逆向工程的关键部分的架构。
At the end of the inception phase, the architecture of the critical part to reverse-engineer should be documented.
第三十八条筹建处工作人员的编制、报酬及费用,经甲乙双方同意后,列人工程预算。
The authorized size, payment and expense of the preparation office, upon the agreement of both Party a and Party b, shall be listed in the project budget.
简略介绍了“用于施工的工程师图”的编制方法及其特点。
The preparation methods and features of construction drawings are briefly described.
编制生产使用冲压工艺卡。参与制件成型工艺评审和制作,与模具工程师共同协作完成模具项目。
Constitute the stamping process card for production. Attend to make and assess the stamping shape process. Complete the die project with the die engineer.
熟悉工程招投标相关法律法规及流程,能熟练编制投标文件;
Familiar with public bidding laws &orders and process, able to compile bidding documents.
据此编制的温度计算程序已为工程设计部门使用。
Computer programs for temperature calculation have practically been used in industrial engineering design.
设计资料的评审工作,由经认可的,未参与原始文件编制工作的工程师负责,并且设计资料应由工程总监,或技术总监进行核准。
Design data is reviewed by an approved engineer not responsible for the generation of the original document and approved by the Engineering or Technical Director.
摘要:水利工程设计概算必须依据设计工程量、施工组织设计,按概算编制规定及概算定额进行编制。
Abstract: Hydraulic engineering design budget must be based on the design engineering, construction management planning, budget preparation and budget quota.
为对制图室和生产工程部编发的生产文件进行控制,特编制了合同专用登记薄。
Contract specific registers are created to control manufacturing documentation generated and issued by the Drawing office and PED.
工程部-设计文件的编制和核工程标准。
Engineering Department - Design documentation, nuclear engineering standards.
提高工程造价编制水平,必须改变现有的计价模式。
In order to improve establishment level of project cost, the present pricing mode must be changed.
所有质量保证记录由核质量保证(NQA)工程师,采用文件登记薄编制索引,标记记录、相关项目或活动。
All the QA records should be indexed by the NQA Engineer using the Document Register to permit identification between the records and item or activity to which they relate.
上述文件采用唯一识别号,并由工程总监指定设计工程师编制。
The above documents which are uniquely identified are prepared by a design engineer designated by the Engineering Director.
工程技术部负责编制顾客提供产品的技术要求及标准,必要时对其产品进行验证认可。
The Engineering Department is responsible for formulating the technical requirements and standards of the customers supplied products, and if necessary, verifying and certificating the products.
分析了在以综合单价形式进行工程量清单报价的投标活动中采用的投标报价策略以及报价编制技巧。
Thee price quotation strategy and skill used in bidding based on bill of quantities with comprehensive unit price are analyzed.
针对环境影响报告书工程分析编制的原则、方法和要点进行了探讨,同时提出了相应的建议。
This paper discusses the principles, methods and points about engineering analysis in report of EIA, at one time, corresponding propose is put forward.
水电建设项目工程档案的分类方案与档号编制,是工程文件归档整理、组卷的关键问题之一。
For hydropower construction projects, achieves classification and number preparation is a critical issue in sorting-out and voluming of project documents.
编制详尽的施工方案及各分项工程的施工措施,并请业主及监理单位确认。
Drawing up the detail construction program and construction measures of sub-divisional work, then submit them to the Owner and Supervision Company for Confirmation.
其中包括工程概况、编制依据、施工方案、吊装管理、安全措施、计划工期和应急预案等。
There are project summary, compilation foundations, construction plan, hoisting management, safety measures, project time limit and emergency plan etc.
摘要:本文汇集了小组成员的管理思路及经验,结合工程实践现编制区域管理方案。
Abstract: : This paper brings together ideas and experience of management team, combined with the engineering practice compiled regional management scheme.
希望通过研究和实例分析,对安装工程技术经济指标的编制、安装工程造价分析提出一些新的见解。
Through research and case study, this paper will give some new insights on the preparation of technical and economic indicators of installation project and analysis of project cost.
希望通过研究和实例分析,对安装工程技术经济指标的编制、安装工程造价分析提出一些新的见解。
Through research and case study, this paper will give some new insights on the preparation of technical and economic indicators of installation project and analysis of project cost.