• 分析了U形钢作用索塔锚固应力大小及分布情况。

    The stress distribution of cable-pylon anchorage zones under U-prestressing tendon is analyzed.

    youdao

  • 本文简要介绍索塔锚固节段模型试验试验结果。

    This thesis sets out to make brief introduction of the full-scale model test and test result of the anchorage zone of the pylon.

    youdao

  • 天津保定桥为面钢箱梁斜拉桥,索塔锚固采用结构

    Steel anchor box structure was used in the cable-tower anchorage zone.

    youdao

  • 钢板混凝土之间连接是否可靠关系整个索塔锚固安全

    Whether the connection between steel plate and concrete pylon wall was reliable related to the safety of the whole anchorage zone of pylon.

    youdao

  • 本文以在建中的金大桥索塔锚固剪力选型试验节段足尺模型试验项目背景

    The type of shear connectors selection test and full-scale model test for the anchorage zone segment of Jintang Bridge, which is under-construction, were the project background.

    youdao

  • 芜湖长江大桥桥锚固预应力混凝土结构中间锚固区为单箱单室结构。

    The cable anchoring zone on the cable tower of the Wuhu Yangtze River bridge is of pre stressed reinforced concrete box structure without intermediate beam.

    youdao

  • 现代斜拉桥满足功能要求前提下,更加注重景观设计也就限制塔锚固区截面尺寸

    Modern cable-stayed Bridges not only meet the needs of the function, but also attach importance to the landscape design, so it restricts the sectional dimension of the anchorage.

    youdao

  • 该文介绍了济南黄河三桥锚固水平受力性能试验模型设计;通过有限元分析,试验模型和实际结构的受力进行了比较。

    The article introduces the design of level bearing performance experiment model for cable pylon anchorage zone of Yellow River No.

    youdao

  • 主梁锚固又是矮斜拉桥一个关键部位,其基本功能强大集中力,安全均匀地传递主梁

    However, cable-girder anchorage is a key part for cable-stayed Bridges, where the local concentrated force of cable will be transferred to the girder safely and uniformly.

    youdao

  • 因此锚固斜拉桥设计施工难点关键

    So, cable-girder anchorage is the difficult and important part in designing and constructing of Extradosed cable-stayed bridge.

    youdao

  • ·拉锚固斜拉桥中的关键部位,其作用是局部集中安全均匀地传递

    Anchorage zone of pylon, which is a key part of cable-stayed bridge, can pass local concentrated cable force to the tower column safely and uniformly.

    youdao

  • ·拉锚固斜拉桥关键部位,拉集中通过这一部位安全均匀地传递中。

    The anchorage zone of the pylon is a key part for cable-stayed Bridges, where the concentrated force of cable will be transferred to the pylon safely and uniformly.

    youdao

  • 模型抗裂安全系数大于1.65,结构锚固设计安全可靠

    The model anti-crack safety coefficient are bigger than 1.65, the anchorage zone of the pylon are safely and reliable.

    youdao

  • 斜拉桥锚固受力结构都比较复杂,属于斜拉桥中的关键部位

    In cable-stayed Bridges the force and structure in pylon-cable anchorage area are more complex. The area belongs to a key part in a cable-stayed bridge.

    youdao

  • 斜拉桥锚固受力结构都比较复杂 ,属于斜拉桥中的关键部位。

    Process experiment of SFRC for anchorage zone between steel anchorage box and cable in bridge tower;

    youdao

  • 斜拉桥锚固受力结构都比较复杂 ,属于斜拉桥中的关键部位。

    Process experiment of SFRC for anchorage zone between steel anchorage box and cable in bridge tower;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定