介绍了某黏土心墙砂砾石坝的安全监测成果。
Safety monitoring results of a dam with clay core are presented.
尼尔基水利枢纽工程主坝结构形式为沥青混凝土心墙砂砾石坝。
The dam structure of main dam of Nierji Water Complex is gravel dam with asphalt concrete core wall.
胶凝砂砾石坝(CSG)是介于混凝土面板堆石坝(CFRD)和碾压混凝土重力坝(RCC)之间的一种新坝型。
Cement sand and gravel (CSG) dam is a new type of dam between concrete-faced rock-fill dam (CFRD) and roller compacted concrete dam (RCC).
介绍了合溪水库工程的概况,选用坝型为粘土心墙砂砾石坝,根据粘土和砂砾石料场的颗分曲线,对反滤料进行了设计。
Hexi Reservoir Project, applying filter design, is introduced, which is made up of clay central core and sandy gravel dam according to the gradation curve of clay and gravel.
1985年对该坝采用砂砾石料覆盖和沥青混凝土面板加固等综合措施进行了处理。
During the rehabilitation construction of 1985, the asphalt facing was covered by the sand gravel with a stone pitching surface.
拦河主坝坝壳以当地材料砂砾石为主,防渗心墙比较了粘土心墙、沥青混凝土心墙和斜墙型式。
The material of the main dam shuck is mainly the local sandy gravel. The clay core and the asphalt concrete core were compared in the choosing of seepage prevention type.
拦河主坝坝壳以当地材料砂砾石为主,防渗心墙比较了粘土心墙、沥青混凝土心墙和斜墙型式。
The material of the main dam shuck is mainly the local sandy gravel. The clay core and the asphalt concrete core were compared in the choosing of seepage prevention type.