适用于各种现浇钢筋混凝土结构中的钢筋连接。
It is suitable for various reinforcing bar connecting in reinforced concrete construction.
该8层高的建筑由工字钢柱地基上的现浇钢筋混凝土结构组成。
This 8 storeys high structure consists of a cast insitu reinforced concrete structure supported on steel H-pile foundation.
结合工作实际,针对现浇钢筋混凝土结构裂缝的产生原因与防治方法进行了论述。
Combined with the actual work, the structure crack causes of cast-in-place reinforced concrete and prevention measures are discussed.
在现浇钢筋混凝土结构模板工程中,它与多层板、竖向支撑配套使用可形成水平支撑模板体系;与多层板、斜撑及对拉螺栓等配套使用可形成竖向模板体系。
In the reinforced concrete structure of the project, it could be the slab formwork system matching with plywood, push-pull prop, tie rod and other accessories.
吉水赣江大桥是江西省第一座拱上建筑采用现浇连续板梁式结构,且桥墩为钢筋混凝土空心墩的箱型拱桥。
Ganjiang bridge in Jishui is the first box-arch bridge, which has continuous cast boards and girders construction on the arch and whose piers made from reinforced concrete are hollow.
介绍运用控制爆破技术拆除现浇钢筋混凝土框架结构的一个实例。
The present paper introduced a blasting case of adopting controlled blasting in demolition of a casting reinforced concrete frame.
以热轧无缝钢管柱为主要竖向承重结构构件,承担现浇钢筋混凝土框架剪力墙结构与钢屋架之间的结构转换作用。
Hot-rolled seamless steel tube column, as the main vertical load-bearing member, plays the role of structure transferring between the cast RC frame shear wall and the steel roof truss.
介绍了现浇钢筋混凝土空心无梁楼盖结构体系的原理、边支承空心楼盖设计原理、刚度计算等方面的问题。
This paper introduces the design principle of cast-in-situ reinforced concrete hollow floor, the design method of side supporting hollow floor, stiffness account and so on.
在现浇钢筋混凝土框架结构中,由于梁柱节点混凝土强度不同,此处混凝土质量难以控制。
The quality of concrete is hard to control in the reinforced concrete frame structures because there are non-equal-concrete-strength beam and column joints.
常规屋面结构大多数为钢筋混凝土现浇或装置式的平屋面。
Routine roof covering structure great majority are that the armoured concrete shows the dyadic flat Ao Yu device roof covering.
本设计采用钢筋混凝土现浇框架结构。
This scheme adopts the cast-in-place frame structure of reinforced concrete.
天朗海峰国际中心塔楼采用现浇钢筋混凝土部分框支剪力墙结构。
Partial frame-supported shear wall structure is adopted for the Synonym Haifeng. Performance based seismic design was proposed.
天朗海峰国际中心塔楼采用现浇钢筋混凝土部分框支剪力墙结构。
Partial frame-supported shear wall structure is adopted for the Synonym Haifeng. Performance based seismic design was proposed.
应用推荐