艾默生还负责所有产品和系统,控制系统配置,培训及其它现场服务的最终验收测试。
Emerson was also responsible for final acceptance testing of all products and systems, control system configuration, training, and other on-site services.
什么是验收测试?验收测试指检验程序。来验证已完成的用户故事是按照现场客户期待的方式开发的。
Acceptance testing is the process of verifying that stories were developed such that each works exactly the way the customer team expected it to work.
为保证配电自动化产品在用户验收阶段的产品质量,需要进行出厂试验(FAT)与现场试验(SAT),其中,馈线自动化测试是配电自动化系统试验的关键。
The factory acceptance test(FAT)and site acceptance test(SAT)of distribution automation system should be done before system putting into operation in order to ensure the product's quality.
监督现场仪表的测试,校正以及负责现场安装仪表的验收。
Supervise the testing, calibration on field and acceptance of installed instrumentation.
监督现场仪表的测试,校正以及负责现场安装仪表的验收。
Supervise the testing, calibration on field and acceptance of installed instrumentation.