• 物料计划合作确保物流费用库存量平衡

    Collaborate with material planner to ensure the balance of logistics cost and material stock level.

    youdao

  • 依据维护任务订单所要求物料清单编制物料计划

    Material planning based on bills of material in maintenance task lists and orders.

    youdao

  • 客户物料计划建立良好沟通联系确保物流绩效

    Build up good communication with customer material planner to ensure qualified Logistics performance.

    youdao

  • 支持产品转移保证物料计划满足产品更新换代需要

    Proactively support the new product introductions, ensuring all material is procured on time to meet the training, pre-production and launch needs.

    youdao

  • 根据滚动生产计划SAP 系统中管理和制定物料计划

    Work out material requirement plan in SAP based on rolling production plan.

    youdao

  • 某段时期实际需求预测需求比较,以得出物料计划系统需求

    The requirements for material planning systems is generated by the comparison between the actual demand and the forecasted demand at given period.

    youdao

  • 5以上物料计划或者供应链工作经验2以上物料计划管理经验。

    Experience: more than 5 years in material planning or Supply Chain, and more than 2 years material planning management.

    youdao

  • 大专以上学历,工科专业毕业者优先,具有2以上采购物料计划经验

    College degree or above, prefer mechanical or engineering degree. More than 2 year working experience in purchasing planner or material planner.

    youdao

  • 根据收到的销售预测操作运行物料需求计划报表输出物料计划并监督执行。

    Run Material Requirement Plan against Forecast and output material requirement plan, monitor material availability.

    youdao

  • 根据生产bom清单物料计划准备跟踪物料避免材料问题而导致生产停止

    Prepare and follow up material according to BOM and material plan, avoid production stop due to material shortage.

    youdao

  • 提供产品生产所需物料计划实现设计财务物资部门企业生产业务流程中的集成

    According to the material plan of product production, the integration among design, finance, material management department was realized in company production task flow.

    youdao

  • 物流操作管理包括包装仓储物料搬运库存控制运输预测战略计划客户服务等方面

    Logistics operation and management include packaging, warehousing, material handling, inventory control, transport, forecasting, strategic planning, customer service, etc.

    youdao

  • MRP(Materials RequirementsPlanning物料需求计划)特别应用于装配生产计划工具目的在于使每个制造单元可以告诉供应商需要什么零件什么时候需要。

    MRP is a planning tool geared specifically to assembly operations. The aim is to allow each manufacturing unit to tell its supplier what parts it requires and when it requires them.

    youdao

  • 物料报告应该根据采购/本地化转移物料状态产生包括到达日期,到达计划,和潜在危险物料清单

    Material status report is created according to purchasing / sourcing / transferring material status, should including delivery date, delivery plan and risk parts list with comments.

    youdao

  • 本文香精香料行业为背景,行业内物料需求计划决策复杂性进行分析研究后,给出套切实可行解决方案

    It studies the complexity in making the decision about the material requirement planning of essence and flavor industry and finds out a feasible project to resolve the issue.

    youdao

  • 专门评估物料产能需求根据需求制定计划及作出时间安排的工作。

    Activities that focus on evaluating demand for material and capacity and formulate plans and schedules based on meeting that demand.

    youdao

  • 根据生产计划分配物料资源

    Reviews schedules to determine resources and materials.

    youdao

  • 第五提出了面向动态需求物料需求计划算法阐述基本原理,给出面向对象的算法实现。

    In the fifth chapter, Material Requirement Planning (MRP) based on separative BOM is brought forward, and its recursion algorithm is given.

    youdao

  • 根据产品生产计划新产品项目领导人指示及时发放物料生产线。

    Release all parts to cell in time according NPD schedule and NPI Project leader's instruction.

    youdao

  • 负责相关工作监督执行工艺设计、数控编程车间生产计划产能计划物料管理

    Responsible for supervision and execution of related areas such as manufacturing engineering, CNC programming, Shop Floor Scheduling, Capacity Planning and Material Organization.

    youdao

  • 计划安排生产活动,为下属提供必要指导确保物料人员设备高效

    Plan and program the production activities, supplying subordinate with the required direction to assure the most effective use of material, labor and support equipment.

    youdao

  • 采购部门沟通协调保障生产用料,生产工具设备供应准备按照生产计划进行催急现场缺少物料.。

    Cooperation with purchasing department, to make sure the production material, tools, equipment are supplied and prepared according to the production planning, push the missing component in production.

    youdao

  • 保证这些物料不断料重要的,不要等到用它们(再买)。计划这些物料花费最小的。

    It is more important to have these materials permanently available than to run out of them. The effort to plan these materials should be minimal.

    youdao

  • 参与年度预算工作中的相关工作,包含长期计划物料采购计划库存计划SAP系统完成LTP需求制定。

    Perform annual budget related to long term planning, material purchasing planning and inventory planning, and execute LTP in SAP.

    youdao

  • 计划根据生产耳目力,物料环境安排试产,并催生产的进度

    Planner will arrange pilot run schedule based on manpower and material, will coordinate with MFG to finish pilot on time.

    youdao

  • 管理物料表、计划生产订单追踪

    Manage bill of materials, plan manufacturing orders, track work orders.

    youdao

  • 合理方式计划组织保管库存保证方便高效搬运物料比如做到:货物摆放合理便于查找,货物放置距离合理、方便存取和搬运。

    Plan, organize and store the stock in the best way to ensure high efficient material handling activities, e. g. the goods easy to be found, and rational distance to be accessed and moved.

    youdao

  • 协助主管生产计划制定、跟进及物料的跟踪扣除库存

    To make a inventory for all materials before store, familiar with overall operation flow of store and material control.

    youdao

  • 协助主管生产计划制定、跟进及物料的跟踪扣除库存

    To make a inventory for all materials before store, familiar with overall operation flow of store and material control.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定