• 获得数据指标试验方法根据GB8076- 1997规定试验方法,包括:泌水坍落度凝结时间差、压强度收缩率

    The testing method of acquiring the data guide lines is based on provision of GB8076-1997 including bleeding rate, slump, concreting time. ratio of compressive strength. shrinkage rate and so on.

    youdao

  • 试验结果表明:一定颗粒分布石灰石粉改善混凝土流动性能,减少泌水缩短凝结时间

    It is shown that the limestone powder with appropriate particle distribution can improve the fluidity of concrete, reduce bleeding rate and shorten the setting time.

    youdao

  • 试验结果表明:一定颗粒分布石灰石粉改善混凝土流动性能,减少泌水缩短凝结时间

    It is shown that the limestone powder with appropriate particle distribution can improve the fluidity of concrete, reduce bleeding rate and shorten the setting time.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定