• 推论最大可能性时间段非线性水压作用坝体上游造成差别。

    It was theorized with a high degree of probability that the change in period was due to the nonlinearity of the hydrodynamic pressure acting on the upstream face of the dam.

    youdao

  • 本文首先对河流中的浅滩进行概化,通过水槽试验测出了浅滩上水流的水压分布流速分布和剪应力沿程变化。

    In this paper, the crossing bars are generalized as a model at first, the dynamic pressure distribution, the velocity distribution and the bed shear stress are measured through flume experiments.

    youdao

  • 并且根据不同通过调节乳化油的,来改变所配乳化液浓度

    The consistence of emulsification liquid can be adjusted by adjusting the pressure of input water and the level of the oil.

    youdao

  • 临空水压爆破技术通过生产实践应用取得了良好的经济技术效益。

    This shows the field Application of explosion-in-water blasting technology without free face to have advantages both in technology assessment and economic effect.

    youdao

  • 利用所编写非稳定渗流计算程序,计算石坝上游水位变化自由位置时间变化规律、孔隙分布情况

    The program is utilized to calculate soil rocks dam free surface position variation and pore-water pressure distribution condition with time when the up water level position changed.

    youdao

  • 本文对动水压力的合理确定作了探讨给出了晃动效应竖向地震影响具体计算方法

    In this paper, sloshing effect and vertical seismic motion influence are discussed as well as the calculating method are given in detail.

    youdao

  • 利用级数展开线性叠加原理本文给出了一种求取弹性影响系数矩阵数值算法。

    A method is set forth to calculate the hydrodynamic pressure influence matrix of elastic dam using series development and linear superposition theorem in this paper.

    youdao

  • 利用级数展开线性叠加原理本文给出了一种求取弹性影响系数矩阵数值算法。

    A method is set forth to calculate the hydrodynamic pressure influence matrix of elastic dam using series development and linear superposition theorem in this paper.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定