模块化施工在AP1000建设过程中的应用,给管道安装工作带来很大挑战。
Modularization construction applies during the AP1000 construction, which is the challenge to the piping system installation.
具有模块化阀的结合,使高压,大容量的电路,施工方便。
Combination with modular valve enables easy construction of high-pressure, large-capacity circuits.
针对施工期结构的时变性特征,提出了一种分析施工结构的简化分析法——模块化方法,大大提高了分析效率。
Because of the time_changing performance of structure during construction, a kind of simplify analysis method -modular method is summarized.
针对施工期结构的时变性特征,提出了一种分析施工结构的简化分析法——模块化方法,大大提高了分析效率。
Because of the time_changing performance of structure during construction, a kind of simplify analysis method -modular method is summarized.
应用推荐