目前许多电站负荷分配需要使用机组效率曲线,但是由于机组效率曲线是通过模型机得来,在实际运行中难免会有误差。
At present, in order to dispatch load, lots of hydropower stations need to use the unit efficiency curve, which more or less has some errors because it is obtained by model test.
数据采集的速度与精度主要由机组效率曲线计算和机组耗流量在线计算解决,负荷分配问题需引入如进化算法等新方法解决。
The data collection accuracy is depends on the efficiency calculation of water turbine generator units; and the evolutional method should be used to solve the load dispatch problem.
数据采集的速度与精度主要由机组效率曲线计算和机组耗流量在线计算解决,负荷分配问题需引入如进化算法等新方法解决。
The data collection accuracy is depends on the efficiency calculation of water turbine generator units; and the evolutional method should be used to solve the load dispatch problem.
应用推荐