• 岩体弹性抗力系数试验难度大,一般特大型水电工程隧洞进行

    The experiment on the elasticity resisting coefficient of rock mass is very difficult to be done, so it is conducted only in the pressure tunnel of oversize hydroelectric projects.

    youdao

  • 工作闸门通常布置隧洞出口,工作闸门要求在动水中启闭,检修闸门常在静水中启闭。

    The hole in the working gate in the export of tunnel usually decorate, working gate often moving water requirements of opening and closing, often in static water maintenance gate opening and closing.

    youdao

  • 工作闸门通常布置隧洞出口,工作闸门要求在动水中启闭,检修闸门常在静水中启闭。

    The hole in the working gate in the export of tunnel usually decorate, working gate often moving water requirements of opening and closing, often in static water maintenance gate opening and closing.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定