根据具体公路施工面积,选用新的护栏进行实际安装。
According to the specific road construction area, the use of new barriers to the actual installation.
根据具体公路施工面积,选用新的波形护栏板进行实际安装。
According to the specific highway construction area, the use of a new waveform guardrail board for actual installation.
开始涂刮时,应根据施工面积大小、外形和用料,同一考虑施工退路和涂刮顺序。
Start scraping, construction should be based on the size, shape and material, to consider a unified retreat and scraping order construction.
备有标准、快干、慢干及特慢等多种型号供选择,以配合不同品种、不同的施工面积及施工湿度。
With standard, Fast Drying, Slow Drying and Extra Slow version, to match various pualities, application area and application humidity levels.
一次施工面积不宜过大,应分条分块错开施工,每块面积不宜大于10m2,错开施工的间隔不应小于24小时。
A construction area should not be too large, should be staggered construction division, each area should not be larger than 10m2, staggered construction intervals of not less than 24 hours.
出于对全球市场需求的担忧,ENCE公司缩小了施工面积,但是这家公司仍旧迫切地希望重启并完成施工。施工完成之后,这将达到博特·尼亚工厂的类似规模。
It scaled down construction owing to concerns over global demand, but is keen to restart and finish construction of what would be a similar-sized plant to Botnia's.
在最近的一份研究研究人员采用计算机模型和数据来自美国宇航局的热带降雨测量卫星的使命估计如何三峡大坝的施工阻面积降雨。
In a recent study, researchers used computer models and data from NASA's Tropical rainfall Measuring Mission satellite to estimate how the dam's construction impacted area rainfall.
本文通过对普通住宅从设计、施工到交付使用的全过程进行跟踪分析,来探讨有关住宅面积是如何计算和确定的,以供广大群众参考利用。
This paper discusses how to calculate the residence area based on the analysis of the residence design, construction and delivery process for the purpose of reference. THEANAL.
北方冬季室内有暖气可正常施工,如果温度不能保证,最好先进行小面积试验。
Northern winter indoor heating can be the normal construction, if the temperature does not guarantee a good idea to test a small area.
无空气喷涂在大面积涂装的领域内,代替了传统的喷涂施工。主要原因如下。
Airless spraying had replaced conventional spraying for painting of large surfaces for the following reasons.
提出了挖孔桩护壁竖向截面积的计算公式,介绍了施工方法,分析了经济效益。
The paper proposed compute formula of digging pile panelling vertical cross section, introduced construction method and analysed economic benefit.
通过施工实例,分析了大面积混凝土裂缝的类型以及产生的原因。
Through practical construction projects, the paper analyses the kinds and reasons of large-area concrete crack.
旁多工程坝基具有的深覆盖、高海拔、防渗面积大、施工作业条件艰苦、可借鉴经验少等特点。
The characteristics of Pangduo dam foundation have deep coverage, high altitude, large impervious area, harsh construction conditions and less construction experience.
拱架具有一定的刚度和抗御风雪的能力,又具有占地面积小,不需拆除可四季使用及造价低廉、施工方便等特点。
The utility model has the characteristics of small ground occupation area, low cost, convenient construction, etc. , and does not need to be dismantled and can be used in four seasons.
通过对马钢某住宅小区大型人防工程混凝土施工的介绍,阐述了大面积防水混凝土的施工技术。
The paper expounds the construction technology of large areas waterproof concrete in the construction of large-scale air-defense concrete project for Masteel Garden Housing.
简要介绍了大面积混凝土地面施工的质量保证措施和施工工艺。
This paper briefly introduces the quality assurance measures and techniques of the construction of large-area floor.
降低主要建筑材料的内含能量强度值和单位建筑面积内建筑材料的使用量,是降低施工初始能耗的有效途径。
It is the key for the reduction of construction initial energy use to reduce the embodied energy intensity and quantity in per usable floor area of the main materials.
公司工程管理人员拥有多年经历及大面积装修施工的经验。
Project management company has many years of construction experience and the experience of a large area decoration.
隧道断面越大,封门拆除时加固土体所暴露的面积也越大,施工风险也就越高。
Larger tunnel section brings larger exposed area and higher risks when shield departs from the working shaft, so the stability of reinforced soil in this stage is the new challenge for the work.
结合安业大厦施工实例,介绍了高层建筑大面积干挂花岗岩的施工过程。
Combined with construction example of Anye mansion the construction process of large area dry hanging granite for high-rise building is introduced.
大面积混凝土地坪施工容易产生裂缝,既有施工原因,也有设计原因和其他原因,但主要是施工原因。
The construction of large-area concrete ground floors tends to bring about cracking, which results from the construction, and from the design and others as well, but mainly from the construction.
现场测量:设计师到施工现场实地测量,包括房间墙壁面积、门窗暖气面积及位置。
The spot measurement: the designer goes to the spot to measure the area and position of the room wall, heating system, doors and Windows.
设计了一种便于携带、使用性强的锚杆测量仪,用来评估现场的施工情况及大面积检测。
Have designed one kind of the anchor measuring apparatus which has strong practicability and is convenient to carry, used for assessing the construction quality of the anchor.
文章结合工程实例,阐述了大面积混凝土金刚砂耐磨地面施工工艺及质量控制要点。
The article combines with practical engineering to present the construction process and quality-control essentials of large area concrete wearing-proof floor.
通过对大面积水磨石楼地面施工常见的如裂缝、空鼓质量问题的原因进行分析,针对性地提出了事前预防以及事后处理的措施。
Based on the study on the causes of quality problems in large terrazzo floor construction such as cracking and hollowing some corresponding treatment measures are proposed.
在岩巷施工中对有化学腐蚀性的含水围岩段,大面积淋水或局部涌水处理无效地段,适于采用石材支护。
In the rock roadway construction, the chemical corrosion water-bearing surrounding rock roadway, large area from spilled water or the ineffective partial pouring water part, adapt to stone support.
但它的轻体,降低工程结构造价和增大室内使用面积、施工速度快及使用灵活性等诸多优点还是被普遍认可的。
But it's light body structure to reduce the project cost and increasing the use of indoor space. The fast construction and the use of many advantages is generally recognized such as flexibility.
空地100平方米起租,其展位费用仅为所租用的空地面积的净地租金,空地展位所有装修费、电费、施工管理费及设施使用费等均由参展商另行负担。
The starting rent area shall be over 100 square meters each, open space, and the booth fare is only referred to the net area. The decoration remodeling and facility use shall be charged additionally.
空地100平方米起租,其展位费用仅为所租用的空地面积的净地租金,空地展位所有装修费、电费、施工管理费及设施使用费等均由参展商另行负担。
The starting rent area shall be over 100 square meters each, open space, and the booth fare is only referred to the net area. The decoration remodeling and facility use shall be charged additionally.
应用推荐