尽管立面的形式很复杂,通过软件的使用,工人可以通过由一个编码系统准备的简单的指令执行施工过程。
Despite the complex form of the facade the construction process was easily executable by workers through simple instructions prepared by employing a system of coding.
负责工程项目从工程施工准备开始直至验收交工,以及签证结算的全过程施工管理工作。
Responsible for the project from construction preparation to completion acceptance, the whole process of construction management and settlement.
事前控制是指对工程准备阶段的控制,事中控制是指对工程施工过程的控制,事后控制是指工程结束后质量的控制。
Pre-control means the control of the project preparation stage, mid-control is the control of the construction process, after control means after the end of the project quality control.
接着,就如何实施工程施工成本控制从投标、施工准备、施工过程以及事后验收总结等方面进行了讨论。
Then, how to implement the construction cost control from the tender, construction preparation, construction process and acceptance summary and so on.
重点介绍石灰土施工准备及施工过程中质量控制的相关问题,阐述了解决问题的办法。
The paper plays emphasis on the preparation of soil-lime construction and the problems correlative to quality control in construction, and expounds solutions for problems.
重点介绍石灰土施工准备及施工过程中质量控制的相关问题,阐述了解决问题的办法。
The paper plays emphasis on the preparation of soil-lime construction and the problems correlative to quality control in construction, and expounds solutions for problems.