本文介绍了澧河刚架拱桥的加固方案及施工方法。
This paper introduces the reinforcing and construction method of LiHe rigid framed arch bridge.
本文介绍了国道220线朱场桥旧桥改造设计方案及施工措施。
This paper introduced Zhuchang Bridge renewal design project and construction method of national road No. 220.
文章对砂砾填筑路基的设计方案及施工工艺进行了研究、探讨。
This paper researches and discusses the design project and construction process of filling sub-grade with shingle.
本文通过工程实例介绍了火灾受损钢筋混凝土结构的修复加固方案及施工方法。
Based on the engineering example, this paper introduces design and construction of rehabilitation schemes.
介绍了地下室地基和底板的加固方案,并详细阐述了加固后的防水处理方案及施工工艺。
The article introduces solutions adopted for foundation stabilization of basement and reinforcement of bottom plate as well as details waterproofing treatment afterwards.
以某码头钢管桩防腐蚀体系二次修复工程为实例,总结出一套切实可行的技术方案及施工方法,解决了滨海码头钢管桩防腐体系二次修复的难题。
Taking one of wharf's as an example, a practical solution to renovation of wharf's steel pilings anti-corrosion system is proposed which is proved effective in practice.
保温材料在施工使用时的含水率应符合设计要求、工艺要求及施工技术方案要求。
The moisture content of insulation materials in construction should meet the design requirements, technical requirements and construction technical requirements.
介绍了深圳某基坑支护工程钢管土钉与搅拌桩组合支护技术方案、设计、施工及应用情况。
Technical scheme, design, construction and application of steel pipe soil nail combining rabbling pile in a foundation ditch support in Shenzhen.
简述了土钉墙支护技术的方案选择、施工工艺、技术要求及质量控制,并就具体实例做了详细分析。
This paper is to discuss the project selection, construction method, technical specification and quality control of soil nailing and analyze the special factor in detail.
通过对旧水泥砼路面结构的分析,提出改建方案,归纳施工要点及取得的效果。
By analysis on the structure of old cement concrete pavement, this paper puts forward reconstruction plan, key points of construction and achieved result.
在重大建筑物施工控制中,放样方法本身的精度估算及分析是制定测量方案的重要依据。
In construction of important and large buildings, a precision estimation and analysis of layout method are important data for working out survey plan.
介绍了粘贴碳纤维布、增设体外预应力束、裂缝处理的加固设计方案及主要施工工艺。
The strengthening design plan and main construction process of affixing carbon fabric, adding external prestressed tendons and cracks treatment were introduced in this paper.
概要介绍了修建上元门越江水底隧道的意义、作用、方案概况及施工设想等。
The synopsis gives an introduction to the significance, functions, schemes as well as construction tentative ideas of building underwater tunnel at Shangyuanmen.
本文主要阐述了隧道塌方的经过及处理方案、措施,希望在以后的施工中有所借鉴。
This paper mainly expounds theprocess andtreatment scheme, the tunnel collapsemeasures, hoping it will be helpfulin the future construction.
编制详尽的施工方案及各分项工程的施工措施,并请业主及监理单位确认。
Drawing up the detail construction program and construction measures of sub-divisional work, then submit them to the Owner and Supervision Company for Confirmation.
对顶升方案、设备、技术、施工、注意事项及取得的效果等作了较详细的阐述。
Details are presented on jacking schemes, equipment, techniques, construction, key points and the results.
可控凝固:几十分钟至几十小时的凝固时间灵活调控,保证维修时间及施工方案的实施;
Controllable set: setting time can be flexible to regulate and control from scores of minutes to hours so as to ensure carry out maintenance time and construction project.
介绍团结灌浆加固隧洞方案的内容、参数的选择确定和施工过程的控制及加固效果。
The choice of parameters, the control works during construction and the effectiveness of the tunnel reinforcement by consolidation grouting are described.
介绍了预注浆方案的设计及施工方法,并分析了注浆效果。
This paper introduces the design of the pre - injecting scheme and the construction method, and analyzes on the injecting results.
本文结合李渡长江大桥施工过程中采购、方案及料机管理等方面的工作,阐述了项目成本控制方面的特点。
Combining purchase, plan, material and machinery management of Lidu Changjiang bridge, this paper presents the characteristic of cost control of the project.
重点介绍了松花江特大桥承台大体积混凝土施工技术方案及实施工艺。
The text introduces construction technology scheme and construction technic of mass concrete main pillar base slab at the Songhua River Bridge.
分析了半跨龙门吊的设计安装要点,着重介绍了T梁的吊装施工组织方案、施工方法及安全技术保证措施。
The points of hoisting design of semi-span gantry crane are analyzed. The construction schemes, methods and safety of T-shaped beam hoisting are introduced.
结合实际情况,提出了较好的桥头搭板的设置方案及台背回填应注意的几个问题,供设计施工参考。
Based on actual conditions, the paper proposes better designing of transition slabs and problems in abutment backfilling for reference of the construction of the same kind.
针对双鼠绕组电机转子的结构问题提出了改进的方案及具体实施工艺。
Improving plans and concrete process are put forward in view of the structure problems of double squirrel cage winding motor.
此项研究为油气储层酸化工艺的研究及制定合理的酸化施工方案提供了重要的资料。
This achievement in research provides important information for the research of the acidizing process of hydrocarbon reservoirs and working out rational acidizing working plan.
介绍了采用10%水泥碎石稳定集料挤密桩加固已施工结束的台背回填土体的挤密原理、设计方案、施工要求及质量控制。
The compaction principle, design scheme, construction demand and quality control of bridge abutment backfill reinforcement using compaction piles that are stabilized with10%cement are introduced.
文中叙述了繁峙孤山水库险加固工程帷幕灌浆的施工方案选择、施工过程及工程的质量检查。
This paper introduces the scheme selection, the construction process and the project quality inspection of curtain grouting in consolidation project of Gushan Reservoir in Fanshi County.
过程检验按施工方案、工艺文件及图纸、标准规定的技术要求进行检验。
In-process inspection should be carried out according to the construction scheme, technology documents, drawings, technical requirements of standards.
通过立丰国际购物广场基坑降水工程实例,介绍和分析深大基坑降水的方案设计及施工技术。
The deep foundation pit's dewatering project scheming and construction technology are introduced in the paper by the example practice of Lifeng international shopping square.
通过立丰国际购物广场基坑降水工程实例,介绍和分析深大基坑降水的方案设计及施工技术。
The deep foundation pit's dewatering project scheming and construction technology are introduced in the paper by the example practice of Lifeng international shopping square.
应用推荐