介绍沈阳公和斜拉桥主塔承台冬季施工的要点和实施中的主要技术措施。
This paper presents the construction highlights and principal technical measures adopted in the construction of pylon pier bases of Gonghe Cable Stayed Bridge in Shenyang in winter season.
对大型斜拉桥主塔基础钢围堰的制作、拼装、定位及下沉的施工测量作了全面论述。
This paper deals with the construction surveying of manufacture, installation, positioning and settlement of steel cofferdam of main towers foundation for a large cable bridge.
滨州黄河大桥主桥是三塔预应力混凝土斜拉桥,主梁为预应力混凝土箱梁。
Binzhou Yellow River bridge is a three-tower cable-stayed bridge with prestressed concrete girders.
南京长江第三大桥是我国第一座主塔采用钢结构形式的斜拉桥。
Nanjing Third Yangzi River Bridge is the first cable-stayed bridge in China of which the main tower is in the form of steel structure.
旨在为大型斜拉桥建设提供可行的主塔基础钢围堰施测方法。
This is aimed at providing an effective measuring method for such kind of cofferdam construction.
独塔混凝土斜拉桥的静力特性主要包括主梁受力及变形、支座反力、主塔受力及变形、拉索受力。
The static characteristics of the single pylon cable-stayed include the internal force and deformation of main girder, reaction force, force and deformation of the main tower.
而主梁锚固区又是矮塔斜拉桥的一个关键传力部位,其基本功能是将拉索的强大集中力,安全、均匀地传递到主梁。
However, cable-girder anchorage is a key part for cable-stayed Bridges, where the local concentrated force of cable will be transferred to the girder safely and uniformly.
在建的武汉二七长江大桥是主梁采用钢结构,桥面板为混凝土结构,主梁与桥面板用剪力件连接的世界上最大跨度的三塔结合梁斜拉桥。
Erqi Yangtze River bridge is composite girder cable-stayed bridge with three towers with the longest span in the world, which is connected with steel girder and concrete slab.
首先对昆玉河斜拉桥做了动力模态分析、反应谱分析、主塔及全桥稳定性分析等常规分析。
Firstly, Routine analyses such as dynamic modal analysis, response spectrum analysis, buckling analysis were used to analyze the bridge.
斜拉桥上部结构包括三个主要部分:索塔、主梁和斜拉索。
The superstructures of cable-stayed bridge mainly include three parts:tower, main girder and stay cable.
这是首次使用移动模架在建设共和斜拉桥主梁,这是一个单一的住宿表面,单塔斜拉桥的桥。
It is the first time for movable scaffolding equipment to be used in the construction of main girder of Gonghe cable-stayed bridge which is a single stay surface, single tower cable-stayed bridge.
这是首次使用移动模架在建设共和斜拉桥主梁,这是一个单一的住宿表面,单塔斜拉桥的桥。
It is the first time for movable scaffolding equipment to be used in the construction of main girder of Gonghe cable-stayed bridge which is a single stay surface, single tower cable-stayed bridge.