板墙筋竖筋分二次绑扎,第一次从底板留出插筋至止水钢板上口留出,搭接倍数,第二次绑扎至顶板面。
Two-time-binding is required for vertical re-bar of plank wall. First binding is made up to water stop plate, second binding is made up to top plate surface.
为了系统研究半刚接钢框架-RC剪力墙结构的滞回性能,编制了非线性有限元程序SRCWNP。
To investigate the hysteresis behavior of composite steel frame with PR connection-reinforced concrete infill wall structural systems, a nonlinear finite element program SRCWNP was developed.
墙幕的搭接处是整个坝基防渗的薄弱点,施工中要保证搭接质量。
The lap of diaphragm wall with curtain grouting is the weak point of dam base seepage control, so in construction process the lap quality must be ensured.
墙幕的搭接处是整个坝基防渗的薄弱点,施工中要保证搭接质量。
The lap of diaphragm wall with curtain grouting is the weak point of dam base seepage control, so in construction process the lap quality must be ensured.
应用推荐