他建造了83英里的排水干道,1100英里的街道排水沟和13000英里的较小的排水沟,均为地下设施。
He built 83 miles of primary sewers, 1, 100 miles of street sewers and 13, 000 miles of smaller sewers, all underground.
贴坡排水层的底脚处必须设置排水沟或排水体,其深度或厚度应使水面结冰后,排水沟(排水体)的下部仍有足够的排水断面。
At the foot of the drainage on embankment slope, there must be a drain, the depth and thickness of which must guarantee enough draining section when the surface is frozen.
贴坡排水层的底脚处必须设置排水沟或排水体,其深度或厚度应使水面结冰后,排水沟(排水体)的下部仍有足够的排水断面。
At the foot of the drainage on embankment slope, there must be a drain, the depth and thickness of which must guarantee enough draining section when the surface is frozen.
应用推荐