采用市场调查和归纳分析法,测算出企业平均招标成本、投标成本和项目招投标成本、招投标成本率。
It takes Chongqing as a case, using market investigation and analytic induction, to measure the average bid cost, average bidder cost and the whole project bid cost.
采用市场调查和归纳分析法,测算出企业平均招标成本、投标成本和项目招投标成本、招投标成本率。
It takes Chongqing as a case, using market investigation and analytic induction, to measure the average bid cost, average bidder cost and the whole project bid cost.
应用推荐