• 保证工程项目质量前提下,项目成本进度优化就成了项目管理成功决定因素。

    In the premise of the high quality of engineering project, the optimization between the project cost and construction schedule determines the successful of a project management.

    youdao

  • 应用传统成本工期管理已经不能够准确反映成本进度绩效水平,更不能进行信息集成控制

    The cost of application tradition and the time limit management cannot mirror exactly the performance level of cost and progress, not to mention the integration control of information.

    youdao

  • 成本控制项目成本管理一个重要环节项目成本管理实施重要的控制要点就是成本进度集成控制。

    Cost control is an important component of cost management of the project, of which the most important implementation is to integrated control costs and the progress of the construction.

    youdao

  • 按照风险影响——如果风险突然出现,计划进度工作量成本的偏离。

    By the impact of the risk — the deviations of schedule, effort, or cost from plan if the risk materializes.

    youdao

  • 便于整个项目生命周期中,项目范围进度风险绩效成本等问题项目干系人沟通

    Facilitating communication regarding the project scope, schedule, risk, performance, cost etc with the stakeholders throughout the project life cycle.

    youdao

  • 一方面,客户需求还是一样的:成本施工进度可靠性功能考虑外观等。

    The client's requirements on the other hand remain the same: dependability regarding costs and scheduling functional considerations and appearance.

    youdao

  • 同时工作成本报告还分解具体进度活动具体的成本报告有关作业要素

    Alternatively, job cost accounts may be disaggregated or divided into work elements which are related both to particular scheduled activities and to particular cost accounts.

    youdao

  • 计划进度控制成本控制、质量控制安全控制工程项目管理重要组成部分

    Plan and schedule control, cost control, quality control and safety control are important parts of project management.

    youdao

  • 赢得原理作为工程项目进度成本综合管理,对施工项目管理起着不可忽视的作用

    As schedule and cost is managed synthetically in project, earned value concept played an important role in construction project management.

    youdao

  • 而挣值管理作为一种新兴项目集成化管理技术能够实现产品研发进度成本质量技术的综合管理控制

    EVM, as a new project integrated management technique, is able to manage integratively and control product development progress, cost, quality and technique.

    youdao

  • 模式针对施工阶段三大目标质量进度成本控制安全文明生产实行过程控制。

    This model mainly focuses on the three objectives during the construction, namely, quality, speed, cost control and process control of safe and civilized production.

    youdao

  • 石油工程项目实施成本战略关键项目进度成本质量进行有效地控制

    The key of low cost strategy for a petroleum engineering project is to effectively control the project progress, its cost and quality.

    youdao

  • 负责项目开发不同团队, 掌控项目进度成本风险评估测试审核,保证项目按期完成

    Drive new projects with teams. follow & control cost , risk and testing to ensure complete it in time.

    youdao

  • 论文最后部分讲述了项目成本管理项目人力资源管理、项目进度管理、项目沟通管理之前的关系

    The last part of the thesis introduced the relationships between the project cost management, project human resources management, project process management and project communication management.

    youdao

  • 此外钻井成本密切相关定向井施工进度预测以前也没有一个方便实用计算机程序

    In addition, the prediction of the directional well drilling cycle is closely related to the cost, there was no convenient and practicable computer program.

    youdao

  • 项目规划实施中,分别项目组织的规划、工作结构分析、项目进度规划及风险管理成本控制质量控制等方面进行研究

    In the project's implementation and control, respectively, the formation of the project team, risk management, cost control, quality control, a study.

    youdao

  • 其次引入动态控制原理进度控制工具,不断的寻求进度成本之间最佳协调方法

    Second, the introduction of dynamic control theory, with progress control as a tool for continuous progress and costs of the coordination point between the best approach.

    youdao

  • 其次引入动态控制原理进度控制工具,不断的寻求进度成本之间最佳协调方法

    Second, the introduction of dynamic control theory, with progress control as a tool for continuous progress and costs of the coordination point between the best approach.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定