• 首先给出了半加热壳体剪力最大应力计算公式

    In this article, it shows formulas to calculate bending moment, shear strength and maximum stress of heat tracing pipe and shell body.

    youdao

  • 由于现浇框架共同工作梁受时,板必然产生附加,同时板也约束梁的转动。

    When the frame beam works under torsional moment, extra bending moment is to be produced in the reinforce slab because the frame beam and the reinforce slab work together.

    youdao

  • 有必要可以配置承担一半以上弯距很适于使桥梁形成优美的曲线轮廓

    If desired, the hogging may be arranged to take more than half the total moment, which fits well with a graceful curved profile.

    youdao

  • 工业厂房现浇混凝土楼面由于混凝土抗压强度偏低弯距钢筋下移造成承载力不足,出现了大量裂缝

    The low grade of concrete and negative moment reinforcement descending cause the appearance of concrete crack in a workshop floor.

    youdao

  • 最后减小曲线梁桥存在耦合作用设计通过设置偏心来调整。

    Finally, the linear eccentricity is adopted in designing in order to reduce the coupling of bend and wring which exist in the curved bridge.

    youdao

  • 安装位置出口下游最少应该有5管道直径的长度的位置。极端情况下可能需要安装流向矫直装置

    Install 5 pipe diameters minimum downstream from pump discharge or elbows to avoid flow turbulence. Flow straighteners may be required in extreme cases.

    youdao

  • 安装位置出口下游最少应该有5管道直径的长度的位置。极端情况下可能需要安装流向矫直装置

    Install 5 pipe diameters minimum downstream from pump discharge or elbows to avoid flow turbulence. Flow straighteners may be required in extreme cases.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定