• 建设周期一般为12原则上超过18个月。

    Construction Period: usually 12 months, no more than 18 months in principle.

    youdao

  • 项目建设周期计划2013年底完成

    The project builds cycle 3 to 5 years, first phase plan is finished by 2013.

    youdao

  • 想世博会建设周期这么短,恐怕很难实现这样理想

    But given the time available for construction, I'm afraid it wasn't easy to achieve this ideal.

    youdao

  • 结构系统立面预制金属构件组成,以便缩短建设周期

    The structural system and the lateral facades where built up with prefabricated metallic elements in order to shorten the construction time.

    youdao

  • 项目具有建设内容丰富建设范围建设周期特点

    This kind of project has some characteristics such as various construction contents, big construction area and long construction period.

    youdao

  • 基础设施建设具有建设周期资金投入量回收期长的特点

    The infrastructure construction has the features of the older building cycle, greatly capital input amount, the longer recovery stage.

    youdao

  • 结构简单紧凑空间利用率占地面积建设周期安装

    Structure is simple, compact, space utilization high, covers an area of less easy to install short construction periods.

    youdao

  • 中国建设周期更快、运营速度美国五十年代设想

    In China's case, it is doing so on a much faster construction timetable and at significantly higher travel speeds than anything envisioned by the United States in the 1950s.

    youdao

  • 通过以上技术应用,提高了项目建设质量缩短建设周期

    Through the above technologies, the quality of projects is improved, thus the construction period is shorted.

    youdao

  • 公交基础设施投资规模建设周期社会效益显著经济效益明显

    The scale of investment on infrastructure of public transit is big, construction period is long, the social benefit is remarkable but the economic benefits are not obvious.

    youdao

  • 另一个因素可能同天然气价格下跌有关,而且燃气发电站建设周期更短,成本更低

    Another factor could be gas: prices have fallen and gas-fired stations are quicker and cheaper to build.

    youdao

  • 一方面,个月的建设周期工程质量是否可以保证电网配套能否跟上

    On the other hand, the three-month construction period, whether it can guarantee the quality of its engineering, power grids and other facilities can keep up?

    youdao

  • 众所周知,个建设项目投资决策项目建成竣工决算一个较长的建设周期

    It will be a long time from the investment decision-making to the completion final accounts of construction project.

    youdao

  • 在经济上具有占地面积小,移动方便深入负荷中心建设周期减小浪费优点。

    Economies are small footprint, easy to move, in-depth load center, short construction period, reduce waste and so on.

    youdao

  • 撇开规划不说,相比煤气作燃料核电站成本更高建设周期更长,因而资金筹措相当困难。

    Planning aside, nuclear plants can be hard to finance, since they cost more and take longer to build than coal - or gas-fired units.

    youdao

  • 为了缩短平台建设周期,使之早日投产平湖油气田采用了预钻井和平台钻井相结合的方式

    In order to reduce platform fabrication period and achieve early start-up, both pre-drilling and platform drilling methods are adopted in developing Pinghu oil & gas field.

    youdao

  • 缩短建设周期提高工程质量等10个方面进行评价,认为-鄯线建设达到国际先进水平

    Reducing the constructed period and improving the engineering quality. It is believed that the construction of Ku Shan oil pipeline reaches to the international advanced level.

    youdao

  • 适应高精度要求国外同类工程多年来一直沿用“先墩后梁”的模式组织建设缺点建设周期太长

    In order to reach the high precision, the construction module"construction of beam after pier", with a disadvantage of long construction term, has been adopted in many foreign projects for decades.

    youdao

  • 由于公路建设项目建设周期单一性环境复杂资金使用量特点,使公路建设过程可能发生各种风险

    Due to its characteristics of long time lasting, complex condition and tremendous usage of capital, it is existed kinds of risks during road construction.

    youdao

  • 灯泡贯流式水电站有着工程量建设周期淹没损失便于集资等优点因此越来越受到人们关注

    Bulb turbine hydropower station has a lot of advantages, such as less project loads, shorter construction period, less submergence, easily to raise funds, so people now concern it more and more.

    youdao

  • 公共基础设施建设具有投资规模建设周期等特点,需要调动社会多方面资源,进行大量协调配合。

    However, public infrastructures need large amount of capital investment and long-term construction, therefore multi-resources shall be accumulated and a lot of coordination shall be made.

    youdao

  • 对于建设周期较长的工程项目,生产过程建材价格上涨风险已经成为业主承包商都不面对无法回避的事实。

    To the engineering project constructed for long period, it is a reluctant and inevitable result faced by the employers and contractors, of the increasing price of materials during the process.

    youdao

  • 这个较长的建设周期,工程变更认为导致项目工期延迟费用超支主要原因工程建设项目管理过程中倍受重视。

    During the long period, It is believed that the mainly reason is the engineering change which results in schedule delay and cost overruns of the construction project.

    youdao

  • 系统仿真一种有效系统规划设计技术独有方法系统的规划设计提供客观、可靠地定量数据缩短系统建设周期

    System simulation is an efficient technology for system layout. It can offer real and reliable data for system layout through its special way. It can also shorten the period of system development.

    youdao

  • 系统仿真一种有效系统规划设计技术独有方法系统的规划设计提供客观、可靠地定量数据缩短系统建设周期

    System simulation is an efficient technology for system layout. It can offer real and reliable data for system layout through its special way. It can also shorten the period of system development.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定