按照工程量清单计算的标价及钢材、木材、水泥等主要材料用量。
The bidding price as calculated per the volume of the construction project and the quantity of consumption of the major materials, including steel, wood and cement.
介绍航道整治建筑物工程量的计算方法、通用程序及使用方法。
The construction volume calculation method, universal programme and application method of channel regulating structures are introduced.
因其设置要求不清楚、计算依据不确定,由此带来工程量结算时的较多争议。
Because the setting requirement of it is not yet clear, and calculating basis is not doubtless, there are more controversies in engineering settlement.
通过对模数、定位线和中心线的研究,可以更精确计算工程量。
The quantities of the works can be calculated more accurately through the study of the module the positioning line and the center line.
工程量十分繁杂,通过对不规则地坑体积的研究,确定其计算公式。
The calculation formula should only be determined by the study of the differeent foundation pits.
在建筑工程计量中,计算工程量的方法有多种。
There are different means of computation in architectural engineering meterage.
结合“水冲法”抽淤的工程监理实践,介绍了清淤工程淤泥工程量4种不同的计算方法,分析其在应用中的优缺点。
In this paper 4 different calculation methods are introduced on the basis of supervision practice of desilting works with water jetting process, with their relative merits in application analyzed.
结合工程实践,对编制市政工程及公路工程土石方工程量依据、计算要点进行了论述。
Based on the practice, discussion is made on the calculating methods and principles of amount of municipal and highway engineering earthworks.
工程量清单计价计算清单算的所有项目。
Quantity Pricing calculated counting all the items in the list.
根据地矿工程体视化仿真系统研究工作的需要,提出了一种基于体素的地下采掘工程量的计算方法。
Oriented toward the development of a 3D visual modeling system for geological and mining engineering, a voxel- based algorithm for computing underground excavation volume is proposed.
应用BP神经网络算法对工程量清单的分项工程价格进行快速估算,为分项工程单方造价提供新的计算方法和理论。
Abstract: BP network is applied in quick estimation of parts cost of Bill Of Quantity(BOQ) in this paper. It provides a new calculation method and theory for meter cost of sub-project.
我们已初步将视算技术用于建筑图形的工程量处理与计算,并收到了较好的效果。
It combines graphic processing, calculation technique and data processing together, and describes the entire procedure of calculation dynamically by graphic display.
清单项包括分部分项工程量清单39项,措施项目清单13项和其他项目清单3项,并对各清单进行了清单工程量计算。
All project is divided into sub engineering quantity list 39, list 13 items measure project and other project list 3 items on the list, and the list of engineering quantity calculation.
[摘要]应用BP神经网络算法对工程量清单的分项工程价格进行快速估算,为分项工程单方造价提供新的计算方法和理论。
Abstract: BP network is applied in quick estimation of parts cost of Bill of Quantity (BOQ) in this paper. It provides a new calculation method and theory for meter cost of sub-project.
结合数字高程模型的特点,对土石方工程量格网法计算方法进行改进。
Combined with the digital elevation model characteristics, this paper improves the grid method that is used to calculate earth-rock volume.
为安装水管所进行的渠道开挖的工程量所用的计算规则条目,与为排水渠所开挖的工程量是相同的。
For example trench excavation for plumbing pipes are governed by the same rules of measurement as trench excavation for drain pipes.
工程量合同:单价合同的一种类型,带有在咨询工程师或建筑师的计划的基础上计算出来的详细量单。
Bill of quantities contract: a type of unit price contract, with a detailed Bill of quantities calculated on the Basis of the plans of the consultant engineer or architect.
第二步对分解到位的模块按照以工程量清单编码为基础的原则进行编码,以便于控制过程中的计算机辅助管理和工程造价的对应信息传输。
In order to fulfill the information exchange of CAM and project cost in the control process, the second step is to coding the analyzed modules based on the codes of construction quantity bill.
通过实例介绍人工挖孔大直径扩底灌注桩工程量的计算方法。
The paper illustrates the calculation of the amount of work in man-operated well digging and pile depositing with the bottom enlarged in diameter.
施工设计包括:清单工程量计算、工程量清单报价(商务标)、施工技术标、施工进度计划及施工平面图的编制。
Construction design includes: a list of projects in terms of Quantity Price (Business standard), standard construction techniques, construction schedule and construction plan preparation.
仅周围的城墙,按当时的生产水平计算工程量的话,需要2万人用3年才能建成。
The surrounding walls, computed according to the production level at that time, needed 20,000 people working 3 years.
仅周围的城墙,按当时的生产水平计算工程量的话,需要2万人用3年才能建成。
The surrounding walls, computed according to the production level at that time, needed 20,000 people working 3 years.
应用推荐