• 按照工程量清单计算标价钢材木材水泥主要材料用量。

    The bidding price as calculated per the volume of the construction project and the quantity of consumption of the major materials, including steel, wood and cement.

    youdao

  • 介绍航道整治建筑物工程量计算方法通用程序使用方法。

    The construction volume calculation method, universal programme and application method of channel regulating structures are introduced.

    youdao

  • 设置要求清楚计算依据不确定,由此带来工程量结算时的较多争议。

    Because the setting requirement of it is not yet clear, and calculating basis is not doubtless, there are more controversies in engineering settlement.

    youdao

  • 通过模数定位线中心线研究可以精确计算工程量

    The quantities of the works can be calculated more accurately through the study of the module the positioning line and the center line.

    youdao

  • 工程量十分繁杂,通过对不规则地坑体积研究确定计算公式

    The calculation formula should only be determined by the study of the differeent foundation pits.

    youdao

  • 建筑工程计量中,计算工程量方法多种。

    There are different means of computation in architectural engineering meterage.

    youdao

  • 结合“”抽淤工程监理实践介绍了清淤工程淤泥工程量4种不同计算方法分析其应用中的优缺点

    In this paper 4 different calculation methods are introduced on the basis of supervision practice of desilting works with water jetting process, with their relative merits in application analyzed.

    youdao

  • 结合工程实践编制市政工程公路工程土石方工程量依据、计算要点进行了论述

    Based on the practice, discussion is made on the calculating methods and principles of amount of municipal and highway engineering earthworks.

    youdao

  • 工程量清单计价计算清单所有项目

    Quantity Pricing calculated counting all the items in the list.

    youdao

  • 根据地矿工程化仿真系统研究工作需要,提出一种基于体素的地下采掘工程量计算方法

    Oriented toward the development of a 3D visual modeling system for geological and mining engineering, a voxel- based algorithm for computing underground excavation volume is proposed.

    youdao

  • 应用BP神经网络算法对工程量清单分项工程价格进行快速估算分项工程单方造价提供新的计算方法理论

    Abstract: BP network is applied in quick estimation of parts cost of Bill Of Quantity(BOQ) in this paper. It provides a new calculation method and theory for meter cost of sub-project.

    youdao

  • 我们已初步将视算技术用于建筑图形工程量处理计算收到了较好的效果。

    It combines graphic processing, calculation technique and data processing together, and describes the entire procedure of calculation dynamically by graphic display.

    youdao

  • 清单包括分部分项工程量清单39项措施项目清单13其他项目清单3项,对各清单进行清单工程量计算

    All project is divided into sub engineering quantity list 39, list 13 items measure project and other project list 3 items on the list, and the list of engineering quantity calculation.

    youdao

  • [摘要]应用BP神经网络算法对工程量清单分项工程价格进行快速估算分项工程单方造价提供新的计算方法理论

    Abstract: BP network is applied in quick estimation of parts cost of Bill of Quantity (BOQ) in this paper. It provides a new calculation method and theory for meter cost of sub-project.

    youdao

  • 结合数字高程模型特点土石方工程量计算方法进行改进

    Combined with the digital elevation model characteristics, this paper improves the grid method that is used to calculate earth-rock volume.

    youdao

  • 安装水管所进行渠道开挖工程量所用的计算规则条目,与为排水渠所开挖的工程量相同的。

    For example trench excavation for plumbing pipes are governed by the same rules of measurement as trench excavation for drain pipes.

    youdao

  • 工程量合同单价合同一种类型带有咨询工程师建筑师计划基础计算出来详细

    Bill of quantities contract: a type of unit price contract, with a detailed Bill of quantities calculated on the Basis of the plans of the consultant engineer or architect.

    youdao

  • 第二对分解到位模块按照以工程量清单编码为基础的原则进行编码,以便控制过程中的计算机辅助管理工程造价对应信息传输。

    In order to fulfill the information exchange of CAM and project cost in the control process, the second step is to coding the analyzed modules based on the codes of construction quantity bill.

    youdao

  • 通过实例介绍人工孔大直径灌注桩工程量计算方法

    The paper illustrates the calculation of the amount of work in man-operated well digging and pile depositing with the bottom enlarged in diameter.

    youdao

  • 施工设计包括清单工程量计算工程量清单报价(商务)、施工技术标、施工进度计划施工平面图编制

    Construction design includes: a list of projects in terms of Quantity Price (Business standard), standard construction techniques, construction schedule and construction plan preparation.

    youdao

  • 周围城墙当时生产水平计算工程量的话,需要2万3才能建成。

    The surrounding walls, computed according to the production level at that time, needed 20,000 people working 3 years.

    youdao

  • 周围城墙当时生产水平计算工程量的话,需要2万3才能建成。

    The surrounding walls, computed according to the production level at that time, needed 20,000 people working 3 years.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定