本标书的编制主要包括施工方案和工程量清单报价两个部分。
The preparation of the tender include two parts of the volume of construction and a list of offering engineering programs .
在工程量清单计价模式下工程造价由分部分项工程费、措施项目费、其他项目费、规费和税金等构成。
When pricing based on bill of quantities, the project cost consists of sub-engineering fee, measure fee, other fee, regulate fee and tax.
清单项包括分部分项工程量清单39项,措施项目清单13项和其他项目清单3项,并对各清单进行了清单工程量计算。
All project is divided into sub engineering quantity list 39, list 13 items measure project and other project list 3 items on the list, and the list of engineering quantity calculation.
摘要]索赔是工程量清单计价规范中的重要组成部分,然而国内的清单计价规范中对其费用构成的内涵外延未做界定。
Abstract: Claim is an important part of the code of valuation with bill quantity, but the connotation and extension of claims are not defined in the valuation mode of Bill of Quantities.
现行的工程量清单计价方法,工程竣工结算一般由合同价、材料调差及签证索赔三部分组成。
BOQ existing valuation methods, the project completed by the contract price settlement in general, materials transfer and visa poor claim is composed of three parts.
现行的工程量清单计价方法,工程竣工结算一般由合同价、材料调差及签证索赔三部分组成。
BOQ existing valuation methods, the project completed by the contract price settlement in general, materials transfer and visa poor claim is composed of three parts.
应用推荐